Summary
Work includes contractor quality control program 1 ls; temporary pipe slope drain 460 lf; compost filter sock 12" (install and remove) 4600 lf; stone construction entrance; erosion control matting (ditches) 2315 lf; rock lined ditch 550 lf; sediment basin 1 ea; mobilization 1 ls; pavement removal 12, 583 sy; clearing and grubbing 2 ac; muck excavation 1000 cy; embankment in place 104,500 cy; markings (temporary runway 5-23) 1 ls: reflective media 1 ls; raise storm manhole structure 1 ea; seeding 55 ac; mulching 55 ac; led medium intensity runway edge light, l-861 (l), stake mounted 54 ea; removed runway fixture, base mounted, complete 72 ea; locate and protect existing equipment 1 ls; shot rock 16084 cy; wire forms 13,997 lf; maintaining traffic 1 ls. See attached file.