Cross Dock 2 Project
Aug 11, 2026
Closes
Sep 16, 2026
Project includes construction of approx. 85,000 SF, type II-B, refrigerated cross dock building, with mixed occupancies of B, F-1, and S-2, with roof heights from 55 to 57 above slab. The building will be sited on approx. 8.5 AC site that includes heavy truck drives and parking areas, underground drainage and utilities.
