Pine Hollow Water Line Replacement - Phase 2
Posted
Sep 28, 2026
Oct 15, 2026
Project consists of the removal and replacement of approx 145 FT of 4" C-900 DR-18 PVC water pipe; 100 LF of 2-Inch PVC Pipe with 4-Inch C-900 DR-18 PVC Pipe at 6-ft Bury Depth (Well No. 2 to Well Pump House).
