Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Petersburg Borough
Seeking consulting firms to develop an industrial pretreatment program. The project involves regulatory compliance assessment, industrial user surveys, local limits development, and program documentation to meet federal and state pretreatment requirements.
Posted Date
Jul 23, 2026
Due Date
Aug 17, 2026
Release: Jul 23, 2026
Petersburg Borough
Close: Aug 17, 2026
Seeking consulting firms to develop an industrial pretreatment program. The project involves regulatory compliance assessment, industrial user surveys, local limits development, and program documentation to meet federal and state pretreatment requirements.
AvailablePetersburg Borough
This RFP is for engineering services for a Wastewater Effluent Disinfection Study, including design, planning, and construction coordination for a new wastewater effluent disinfection system at the Petersburg Borough Wastewater Treatment Facility.
Posted Date
-
Due Date
Aug 17, 2026
Petersburg Borough
Close: Aug 17, 2026
This RFP is for engineering services for a Wastewater Effluent Disinfection Study, including design, planning, and construction coordination for a new wastewater effluent disinfection system at the Petersburg Borough Wastewater Treatment Facility.
AvailablePetersburg Borough
Replace the broken section of discharge pipe with approximately 64. 5 linear feet of high density polyethylene pipe, concrete anchors, and a flapper gate valve. Work includes installing hdpe pipe, concrete anchor blocks, flap gates, and connection to existing outfall pipe.
Posted Date
May 13, 2026
Due Date
Jun 5, 2026
Release: May 13, 2026
Petersburg Borough
Close: Jun 5, 2026
Replace the broken section of discharge pipe with approximately 64. 5 linear feet of high density polyethylene pipe, concrete anchors, and a flapper gate valve. Work includes installing hdpe pipe, concrete anchor blocks, flap gates, and connection to existing outfall pipe.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Petersburg Borough
The meeting included discussions on a proposed wireless communication facilities ordinance, specifically concerning GCI's plan to replace equipment with a camouflaged tower on Nordic Drive to meet FCC Alaska Plan obligations. Community members expressed concerns regarding the ordinance's potential impact on residential aesthetics, the influence of tech industry lobbyists, and the need for stricter conflict of interest and nepotism standards. Additionally, there was discussion regarding a proposed ballot initiative for a senior sales tax exemption, with residents urging the assembly to allow the public to vote on the measure.
The board meeting documentation covers operational updates and maintenance reports, including water safety programs, facility usage for community events, and upcoming sporting events. A key discussion item involved the aging basketball hoop system in the community gym, with the board exploring potential fundraising and repair solutions. Additionally, the Director's report detailed ongoing maintenance projects, specifically regarding sewer repairs and locker room floor renovations, as well as staffing updates.
This presentation provided an update on the 65% design status of the Scow Bay Boat Yard haulout project. The session covered key infrastructure improvements, including the development of a versatile concrete haulout ramp, a wash-down pad with wastewater treatment capabilities, and utility upgrades. Additionally, the presentation discussed environmental permitting, long-term master planning for the area, and upcoming project steps including final design and bid assistance.
The board reviewed and approved revisions to the Petersburg Library Art Education Endowment guidelines to clarify name usage and long-term oversight. The session included the formal acknowledgment of significant financial donations to the endowment. The Director's report addressed budget updates, including the adjustment of library operating hours, the successful reinstatement of IMLS funding, continued sponsorship for the summer reading program, and the implementation of a new online news subscription service for library patrons.
The meeting focused on the future of tourism in the community, with particular emphasis on cruise ship interactions, potential partnerships for new dock infrastructure, and the associated impacts on the local economy and fishing industry. Discussions included the need for responsible tourism management, the potential for new taxes on marine passengers and fish boxes to support local services, and the operational challenges faced by emergency services, such as coordinating medical evacuations and sharing safety plans with cruise operators.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Petersburg Borough's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge