Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Peters Township
The project includes Cured-in-Place pipe (CIPP) lining of approx. 340 feet of 15" diameter CMP, 490 feet of 24" diameter CMP, and 145 F of 24-inch diameter SLCPP storm sewers. Additional work will include pre- & post-installation inspection, removal of existing obstructions via internal robotic cutting, point repairs by open cut excavation that are required to facilitate lining, bypassing operations if required, traffic control, and other items incidental to the project.
Posted Date
Jun 18, 2026
Due Date
Jul 6, 2026
Release: Jun 18, 2026
Peters Township
Close: Jul 6, 2026
The project includes Cured-in-Place pipe (CIPP) lining of approx. 340 feet of 15" diameter CMP, 490 feet of 24" diameter CMP, and 145 F of 24-inch diameter SLCPP storm sewers. Additional work will include pre- & post-installation inspection, removal of existing obstructions via internal robotic cutting, point repairs by open cut excavation that are required to facilitate lining, bypassing operations if required, traffic control, and other items incidental to the project.
AvailablePeters Township
Work includes approx 150,780 SY asphalt to be rejuvenated.
Posted Date
Apr 16, 2026
Due Date
May 1, 2026
Release: Apr 16, 2026
Peters Township
Close: May 1, 2026
Work includes approx 150,780 SY asphalt to be rejuvenated.
Peters Township
Expansion and overlay of the amphitheater parking lot at Peterswood Park (approximately 2,400 square yards), including linestriping, signage, bumper blocks and lawn restoration; and the resurfacing of five 8’ wide Arrowhead Trail Connector paths (approximately 1,940 linear feet). Also, one Add Alternate for an additional 460 linear feet of 5’ wide pedestrian path resurfacing.
Posted Date
Mar 13, 2026
Due Date
Apr 3, 2026
Release: Mar 13, 2026
Peters Township
Close: Apr 3, 2026
Expansion and overlay of the amphitheater parking lot at Peterswood Park (approximately 2,400 square yards), including linestriping, signage, bumper blocks and lawn restoration; and the resurfacing of five 8’ wide Arrowhead Trail Connector paths (approximately 1,940 linear feet). Also, one Add Alternate for an additional 460 linear feet of 5’ wide pedestrian path resurfacing.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $30,000, use sole source.
Coops: Coops first: Buy via COSTARS or Sourcewell. If easier, run it through a familiar reseller on that coop.
Peters Township, PA shows no sole source awards above $30,000 and favors competitive processes. Treat sole source as a low-probability path—pivot to cooperative contracts quickly.
Board meetings and strategic plans from Peters Township
The 2026 Peters Township Comprehensive Plan establishes a clear, community-supported vision to guide growth, preservation, and public investment over the next decade. The plan shifts focus from expansion to thoughtful management of land, infrastructure, services, and community character, providing a practical framework for policy decisions and regulatory updates. It is organized around six key themes: guiding land use and development, fostering economic development and financial sustainability, promoting housing variety, enhancing community facilities, promoting infrastructure improvements, and increasing connectivity and multi-modal mobility. The plan aims to balance growth with preservation while maintaining the Township's character and fiscal health.
The Peters Township Comprehensive Plan Update focuses on assessing community needs and developing strategies for future land use, transportation, and open space. Key activities include gathering community feedback through online surveys and stakeholder meetings, analyzing existing land use and open space, and brainstorming key theme areas and transformation sketches to guide the plan's development. The plan aims to address issues such as managing growth, protecting natural resources, improving infrastructure, and enhancing community engagement to maintain and improve the quality of life for residents.
The comprehensive plan for Peters Township focuses on the community's vision for the next 10-15 years, addressing housing, economic development, land use, infrastructure, parks, recreation, community facilities, and natural resources. It serves as a road map and policy guide for decision-making and helps secure funding for projects. The plan emphasizes achievable goals and strategies, centered around theme areas, and involves a Steering Committee for feedback. Key findings from surveys and focus groups highlight the importance of managing growth, protecting natural resources, maintaining quality of life, and improving infrastructure.
The comprehensive plan update for Peters Township is a community's vision for the next 10-15 years. It includes a statement of goals and objectives related to housing, economic development, land use, infrastructure, parks, recreation, community facilities, and natural resources. The plan serves as a road map and policy guide for decision-making and helps secure funding for projects and initiatives. Key components of the plan include visioning, outreach, needs assessment, strategy development, plan development, capacity building, and implementation, with a focus on achievable goals and strategies.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Peters Township's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge