Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Peace River
The Town of Peace River, Alberta, is issuing an Invitation to Bid (Solicitation AB-2026-05132) for the construction of four flow monitoring stations along Pat's Creek within the town. The scope includes site preparation, installation of monitoring equipment (video camera and radar level sensors at two locations, in-stream flow and level monitoring at two locations), and setup and commissioning of required SCADA and communication equipment. The project requires materials, equipment, permits, traffic/pedestrian accommodation, and site restoration, with work to be evaluated by the Town and its consultant.
Posted Date
Jul 16, 2026
Due Date
Jul 31, 2026
Release: Jul 16, 2026
Peace River
Close: Jul 31, 2026
The Town of Peace River, Alberta, is issuing an Invitation to Bid (Solicitation AB-2026-05132) for the construction of four flow monitoring stations along Pat's Creek within the town. The scope includes site preparation, installation of monitoring equipment (video camera and radar level sensors at two locations, in-stream flow and level monitoring at two locations), and setup and commissioning of required SCADA and communication equipment. The project requires materials, equipment, permits, traffic/pedestrian accommodation, and site restoration, with work to be evaluated by the Town and its consultant.
AvailablePeace River
The Town of Peace River has issued a public notice regarding roadwork on 94 Street. Drivers should expect intermittent lane closures on 94 Street between Friday, July 3, and Friday, July 24, 2026, to accommodate construction work. The closures will occur only as needed for several days at a time, with traffic maintained in alternating directions using temporary traffic signals.
Posted Date
Jul 2, 2026
Due Date
Jul 24, 2026
Release: Jul 2, 2026
Peace River
Close: Jul 24, 2026
The Town of Peace River has issued a public notice regarding roadwork on 94 Street. Drivers should expect intermittent lane closures on 94 Street between Friday, July 3, and Friday, July 24, 2026, to accommodate construction work. The closures will occur only as needed for several days at a time, with traffic maintained in alternating directions using temporary traffic signals.
Peace River
The Town of Peace River is seeking contractors through an Invitation to Bid for the 611-23 Trail Overlay 2026 project. The work involves providing pricing for base course, asphalt concrete pavement, and concrete work relating to existing trails in the north end of Peace River on existing flood protection infrastructure. This is categorized as a Construction opportunity with a closing date of June 23, 2026 at 2:00 PM MT.
Posted Date
Jun 5, 2026
Due Date
Jun 23, 2026
Release: Jun 5, 2026
Peace River
Close: Jun 23, 2026
The Town of Peace River is seeking contractors through an Invitation to Bid for the 611-23 Trail Overlay 2026 project. The work involves providing pricing for base course, asphalt concrete pavement, and concrete work relating to existing trails in the north end of Peace River on existing flood protection infrastructure. This is categorized as a Construction opportunity with a closing date of June 23, 2026 at 2:00 PM MT.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Peace River
The board discussed and moved to accept an update to the Peace River Museum Public Access to Collections Directive. Discussions were also held regarding naming conventions for new wayfinding signage and potential options for setting a separate fee rate for the Centre Ice Logo. Additionally, the board held a closed session to evaluate applications for FCSS Grants to Groups, ultimately awarding funding to Peace Regional Outreach, the Resource Centre for Suicide Prevention, Sagitawa Friendship Society, and NPSPVD - Stepping Up.
The committee discussed and approved a proposal to purchase 23 gift certificates, valued at $60.00 each, for medical professionals at the Sunrise Medical Center, the Aspen Mile Medical Clinic, and for the Radiologist and General Practitioner Anesthetist at the Peace River Hospital. The total expenditure for this initiative was capped at $1,380.00.
The committee held discussions regarding several delegation presentations, including those for housing projects and organizational grants. The agenda included updates on the Peace River Municipal Library and Art Gallery, the Taxi Pass Program, and the ATCO 2025 Franchise Report and streetlight savings. Members initiated discussions on the 2026 Operating Budget, accepted various departmental reports, and moved into a closed session to review a legal land matter and the Chief Administrative Officer performance evaluation.
The Council discussed several items, including initiating the detailed design for the New Town Hall project and receiving updates on wastewater treatment plant repairs and the Highway 743 collaboration. Financial approvals were made for a budget increase to the Fieldhouse Wall capital project and a transfer to the roads operating budget for snow removal costs. The Council addressed regional partnerships, including the withdrawal of membership from the Peace Regional Economic Development Alliance and research into the Mihta Askiy Data Centre Project. Additionally, the Council made an appointment to the Economic Development Committee, authorized attendance at the RhPAP Conference, received various departmental and board reports, and held a closed session regarding an RCMP and Crime Stoppers initiative.
The meeting featured a presentation from the municipal energy manager on the town's municipal energy management program, specifically focusing on the transition from baseline development to action planning. Topics included the establishment of a 2024 energy baseline, the importance of weather normalization for natural gas consumption, benchmarking efforts for the town's facility portfolio, and strategies for future capital planning, grant readiness, and governance integration to improve energy performance.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Peace River's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge