South Side Water System Improvements Division 1: Luminary Lane & Highway 63 Division 2: SE Connector & Highway 23 Oskaloosa Municipal Water Department RFP
Posted
-
Dec 8, 2026
Division 1: installation of approx. 8,235' of 8" water main pipe and appurtenances including but not limited to the installation of water main, fittings, valves, service connections, connections to existing water main, casing pipe for highway crossings field tile repair, temporary traffic control, site restoration, management of a SWPPP. Division 2: installation of approx. 2,510' of 12" water main, 6,785' of 8" water main pipe and appurtenances including but not limited to the installation of water main, fittings, valves, service connections, connections to existing water main, casing pipe for highway crossings field tile repair, temporary traffic control, site restoration, management of a SWPPP.