CityNE
Posted
Oct 20, 2026
Dec 1, 2026
South 3rd Street Water System Improvements RFP
Construction of approx., 1,650 LF of 6" water main, valves, and service line installations.
Description: Division 1: installation of approx. 8,235' of 8" water main pipe and appurtenances including but not limited to the installation of water main, fittings, valves, service connections, connections to existing water main, casing pipe for highway crossings field tile repair, temporary traffic control, site restoration, management of a SWPPP. Division 2: installation of approx. 2,510' of 12" water main, 6,785' of 8" water main pipe and appurtenances including but not limited to the installation of water main, fittings, valves, service connections, connections to existing water main, casing pipe for highway crossings field tile repair, temporary traffic control, site restoration, management of a SWPPP.
SpecialDistrict · IA, US
Decision makers connected to this RFP from Oskaloosa Municipal Water Department.
Adjacent opportunities open for bidding right now.
CityNE
Posted
Oct 20, 2026
Dec 1, 2026
Construction of approx., 1,650 LF of 6" water main, valves, and service line installations.
CitySC
Posted
-
Dec 3, 2026
Construction of approximately 3,000 linear feet of 12-inch PVC water line, 1,250 linear feet of 14-inch HDPE directionally drilled water line, four fire hydrant assemblies, and reconnections to 38 existing water services along Highway 905.
Currituck County Department of Fire-Emergency Medical Services
Fire DepartmentNC
Posted
Oct 29, 2026
Dec 10, 2026
Construction of two new water booster pump stations at Sligo and Barco and upgrades to existing stations at Coinjock and Tulls Creek.
CountyNC
Posted
Oct 29, 2026
Dec 10, 2026
The Project consists of providing all materials, equipment and labor necessary for the construction of two new water booster pump stations (Sligo and Barco), and upgrades to two existing water booster pump stations.
Solicitation files and supporting documents for this bid.