Stage 3 Closure Construction RFP
Posted
Sep 28, 2026
Oct 23, 2026
Prepare the Stage 3 Closure Area to subgrade. Construction of approximately 7.0 acres geosynthetic landfill capping system.Prepare barrier protection and topsoil layers.Install surface water drainage.All other miscellaneous work.

