Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Omaha Airport Authority
Airfield pavement joint rehabilitation. Combined construction will include removal and disposal of existing joint material, resealing of the joints, and miscellaneous construction items.
Posted Date
Jul 15, 2026
Due Date
Aug 6, 2026
Release: Jul 15, 2026
Omaha Airport Authority
Close: Aug 6, 2026
Airfield pavement joint rehabilitation. Combined construction will include removal and disposal of existing joint material, resealing of the joints, and miscellaneous construction items.
AvailableOmaha Airport Authority
The anticipated work includes replacement and enhancement of five diesel fueled engine driven propeller pumps for storm water conveyance at the Pump Station. The diesel engines will be removed and replaced with electric drive motors and the storm water propeller pumps will be rehabilitated. The project also includes the construction of a new electrical building, installation of a new emergency backup generator, and other miscellaneous work.
Posted Date
May 11, 2026
Due Date
May 21, 2026
Release: May 11, 2026
Omaha Airport Authority
Close: May 21, 2026
The anticipated work includes replacement and enhancement of five diesel fueled engine driven propeller pumps for storm water conveyance at the Pump Station. The diesel engines will be removed and replaced with electric drive motors and the storm water propeller pumps will be rehabilitated. The project also includes the construction of a new electrical building, installation of a new emergency backup generator, and other miscellaneous work.
Omaha Airport Authority
Operations and Maintenance (O&M) services of the new inbound and outbound in-line baggage handling system (BHS) at Eppley Airfield (OMA or Airport).
Posted Date
Apr 21, 2026
Due Date
May 21, 2026
Release: Apr 21, 2026
Omaha Airport Authority
Close: May 21, 2026
Operations and Maintenance (O&M) services of the new inbound and outbound in-line baggage handling system (BHS) at Eppley Airfield (OMA or Airport).
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Chief Commercial Officer / ACDBE Liaison Officer (ACDBELO)
Premium
Access the largest public sector contact database
© 2026 Starbridge