Concrete Debris Removal RFP
Posted
Sep 4, 2026
Sep 29, 2026
Schedule A – Concrete Debris Removal: Contractor shall load, haul, and dispose of an existing stockpile of concrete debris from the site, consisting of 52,000 CY. Schedule B – Concrete Debris Crushing: Contractor shall crush the existing stockpile of concrete debris, including separation and disposal of reinforcing steel, and stockpile the crushed material on site.