Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $25,000, use sole source.
Coops: If you’re on Sourcewell, propose using it and confirm with Procurement/department.
Oconee County, GA: No viable sole source path above the $25,000 competitive bidding threshold; policies mandate competition.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Oconee County's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Deputy County Clerk
Finance Director
Code Enforcement Officer
Director
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Oconee County
Provide all materials, equipment & labor required to apply liquid calcium chloride treatment (minimum 38%) to eighteen (18) miles of roadway and six (6) properties.
Posted Date
Jan 21, 2026
Due Date
Feb 20, 2026
Release: Jan 21, 2026
Oconee County
Close: Feb 20, 2026
Provide all materials, equipment & labor required to apply liquid calcium chloride treatment (minimum 38%) to eighteen (18) miles of roadway and six (6) properties.
AvailableOconee County
Installing new flute fill insulation/TPO roofing system with contour ribs over existing standing seam metal roof. The civic center has a roof area of approximately 28,972 square feet. This project also includes removal of a skylight and in-fill with wood framing. An existing gas exhaust flue located at northeast end of roof will be removed. A new exhaust flue will be installed at the mechanical room and exit through the exterior wall. Existing lightning protection will be removed and reinstalled.
Posted Date
Nov 17, 2025
Due Date
Dec 18, 2025
Release: Nov 17, 2025
Oconee County
Close: Dec 18, 2025
Installing new flute fill insulation/TPO roofing system with contour ribs over existing standing seam metal roof. The civic center has a roof area of approximately 28,972 square feet. This project also includes removal of a skylight and in-fill with wood framing. An existing gas exhaust flue located at northeast end of roof will be removed. A new exhaust flue will be installed at the mechanical room and exit through the exterior wall. Existing lightning protection will be removed and reinstalled.
Oconee County
Work includes construction of approx 2,894 LF of 12" dia gravity sewer main to replace the existing 8" gravity sewer line between parkway boulevard and oconee connector, video taping of gravity sewer route, additional crushed stone bedding, including excavation of unsuitable material 500 CY, rock removal 350 CY, construction access road (cr) 350 SY, construction exit (co) 2 EA, temp silt fence c (sd1) 5,180 LF, hay bales 100 EA, slope stabilization (ss) 6,750 SY, rip rap (ch-2) 250 SY, bypass pumping, standard sewer manhole, 48" dia. 146 VF, large diameter manhole base, 60" dia. See attached file.
Posted Date
Oct 15, 2025
Due Date
Nov 13, 2025
Release: Oct 15, 2025
Oconee County
Close: Nov 13, 2025
Work includes construction of approx 2,894 LF of 12" dia gravity sewer main to replace the existing 8" gravity sewer line between parkway boulevard and oconee connector, video taping of gravity sewer route, additional crushed stone bedding, including excavation of unsuitable material 500 CY, rock removal 350 CY, construction access road (cr) 350 SY, construction exit (co) 2 EA, temp silt fence c (sd1) 5,180 LF, hay bales 100 EA, slope stabilization (ss) 6,750 SY, rip rap (ch-2) 250 SY, bypass pumping, standard sewer manhole, 48" dia. 146 VF, large diameter manhole base, 60" dia. See attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.