Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Northwest Harris County Mud 5
The Northwest Harris County Municipal Utility District No. 5 is soliciting proposals for surveying services for the Grant Road Lift Station project in Harris County, Texas. The scope of work includes construction staking, as-built lift station surveying, and general surveying services with an estimated agency value of approximately $14,000. A virtual bid event is scheduled via Microsoft Teams for April 28, 2026, with Pape-Dawson Engineers serving as the primary contact for the bid package.
Posted Date
Apr 11, 2026
Due Date
Apr 28, 2026
Release: Apr 11, 2026
Northwest Harris County Mud 5
Close: Apr 28, 2026
The Northwest Harris County Municipal Utility District No. 5 is soliciting proposals for surveying services for the Grant Road Lift Station project in Harris County, Texas. The scope of work includes construction staking, as-built lift station surveying, and general surveying services with an estimated agency value of approximately $14,000. A virtual bid event is scheduled via Microsoft Teams for April 28, 2026, with Pape-Dawson Engineers serving as the primary contact for the bid package.
AvailableNorthwest Harris County Mud 5
Provide lift station no. 5, 6, and 11 generator additions. Scope of project to include but not limited to: three (3) natural gas generator additions including foundations, sound attenuating enclosures, load banks, duct banks, ATS, existing pavement saw cut and disposal, and all necessary electrical components and all appurtenances for a complete emergency natural gas generator electrical power system addition for the three (3) different existing lift stations, in accordance with plans and specifications. Site restoration. All work shall be complete in place.
Posted Date
Oct 23, 2025
Due Date
Nov 12, 2025
Release: Oct 23, 2025
Northwest Harris County Mud 5
Close: Nov 12, 2025
Provide lift station no. 5, 6, and 11 generator additions. Scope of project to include but not limited to: three (3) natural gas generator additions including foundations, sound attenuating enclosures, load banks, duct banks, ATS, existing pavement saw cut and disposal, and all necessary electrical components and all appurtenances for a complete emergency natural gas generator electrical power system addition for the three (3) different existing lift stations, in accordance with plans and specifications. Site restoration. All work shall be complete in place.
Northwest Harris County Mud 5
The project includes demolition and removal of Ground Storage Tank No. 1, above-ground water well discharge piping, booster pump station piping and foundation, generator pad, and fuel tank with foundation. The existing booster pumps and motors will be refurbished, including replacement of seals with mechanical seals. Furnish and install new 426,500-gallon welded steel ground storage tank with cathodic protection, along with new water well discharge piping, booster pump station piping and foundation pad, and a diesel-powered emergency generator. Hydropneumatic Tanks No. 1 (10,000 gallon) and No. 2 (15,000 gallon) will be rehabilitated by power washing, abrasive blasting, and recoating of both interior and exterior surfaces. The project also includes site preparation, grading, drainage, yard piping, and all components to ensure the smooth operation of the water plant.
Posted Date
-
Due Date
Nov 19, 2025
Northwest Harris County Mud 5
Close: Nov 19, 2025
The project includes demolition and removal of Ground Storage Tank No. 1, above-ground water well discharge piping, booster pump station piping and foundation, generator pad, and fuel tank with foundation. The existing booster pumps and motors will be refurbished, including replacement of seals with mechanical seals. Furnish and install new 426,500-gallon welded steel ground storage tank with cathodic protection, along with new water well discharge piping, booster pump station piping and foundation pad, and a diesel-powered emergency generator. Hydropneumatic Tanks No. 1 (10,000 gallon) and No. 2 (15,000 gallon) will be rehabilitated by power washing, abrasive blasting, and recoating of both interior and exterior surfaces. The project also includes site preparation, grading, drainage, yard piping, and all components to ensure the smooth operation of the water plant.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Northwest Harris County Mud 5
The Board of Directors appointed a new director to fill a vacancy and discussed various community concerns, including water service, potential sidewalk and trail extensions, and requests to clean lift stations. The meeting included presentations of the law enforcement, park and trail, bookkeeper, operator, and engineer reports. Key business actions included approving an Identity Theft Prevention Program, authorizing a report filing with the Texas Comptroller, reviewing solid waste collection fee increases, engaging a delinquent tax attorney, and making decisions on various annexation requests.
The special meeting focused on two main agenda items: the consideration of appointing a director to fill the vacancy left by a resignation, and pending business. During the discussion on the director vacancy, the Board deliberated on whether to leave the position open until the May 2026 election or to appoint a director sooner, ultimately agreeing to interview interested candidates before making a final decision.
Key discussions and actions included the presentation of the Constable's law enforcement report, the approval of the Order adopting an over 65 or disabled tax exemption for the 2026 tax year, and review of the parks and trails report, which included approval of pay applications. The Board also approved the bookkeeper's report, invoices, and investment schedules. The operator's report was accepted, noting 8,251 total connections, 96.9% water accounted for, and no waste discharge permit violations; service termination for delinquent customers was authorized. The attorney provided an update on 2025 tax collections (57% collected). The auditors' limited scope examination for reimbursing CC Shaw Limited was reviewed and authorized. The engineer's report resulted in the approval of submitting the 22nd bond application to the Texas Commission on Environmental Quality, and authorization to prepare the Risk and Resiliency Assessment and Emergency Response Plan. The Storm Water Solutions report was approved. Finally, the Board adopted an order calling the Director's election for May 2, 2026, and discussed deferring an appointment decision and requesting a modified proposal from Best Trash regarding a fee increase.
The Board meeting focused on several reports and actions. Key discussions included the presentation of the Harris County Constable's Office law enforcement report. The Board approved the dark Condon parks and trails report, including the status of the nature park, Phase 3 trails agreement with Harris County, sign replacement, and bridge caps. Financial matters reviewed included the bookkeeper's report, invoices, investments, and general fund comparison against budget. The operator's report noted 8,242 total connections and approved the report while authorizing service termination for delinquent customers. The engineer's report covered fee proposals, approval of a utility financing and reimbursement agreement for the Horizon at Cypress development, and updates on the risk and resilience assessment requirement, bond application status, and ongoing construction projects. The Storm Water Solutions (SWS) report was also approved, with one director abstaining. Finally, the Board acknowledged and approved the attorney's action to prepare and file the required eminent domain report with the state comptroller's office. Director Mindy Cernosek submitted her resignation due to moving from the District, which the Board accepted.
The Board discussed and acted on various reports and items, including the constable's law enforcement report, parks and trails report, bookkeeper's report, and the audit report for the fiscal year ended July 31, 2025. They reviewed the District's Investment Policy and compliance with Texas Local Government Code, Section 2271, as well as continuing disclosure obligations. The operator's report, engineer's report, and Storm Water Solutions report were also reviewed and approved, with Director Griffith abstaining from the SWS discussion and voting. The Board also discussed non-potable water rates, insurance coverage renewal, and designated a director for the Association of Water Board Directors election.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Northwest Harris County Mud 5's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Operator Representative to the District (Municipal District Services, LLC)
Premium
Access the largest public sector contact database