Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
North Washington St Water Sanitation District
Project consists of rehabilitation work for existing 8-inch and 10-inch sanitary sewer including approx. 3,934 LF of 8-inch and 357 LF of 10-inch cured-in-place pipe, service line reinstatements, and twenty three (23) protruding tap removals.
Posted Date
Jul 23, 2026
Due Date
Aug 18, 2026
Release: Jul 23, 2026
North Washington St Water Sanitation District
Close: Aug 18, 2026
Project consists of rehabilitation work for existing 8-inch and 10-inch sanitary sewer including approx. 3,934 LF of 8-inch and 357 LF of 10-inch cured-in-place pipe, service line reinstatements, and twenty three (23) protruding tap removals.
AvailableNorth Washington St Water Sanitation District
The scope is generally, the abandonment of existing 10" cast iron potable main with the installation of approximately 6,196 LF of 12", 5 LF of 10", and 161.5 LF of 8" Ductile Iron potable water main, jack and bore 81-LF of 24" steel casing under Union Pacific Railroad, service line reinstatements, and fire hydrant installations/replacements.
Posted Date
May 7, 2026
Due Date
May 29, 2026
Release: May 7, 2026
North Washington St Water Sanitation District
Close: May 29, 2026
The scope is generally, the abandonment of existing 10" cast iron potable main with the installation of approximately 6,196 LF of 12", 5 LF of 10", and 161.5 LF of 8" Ductile Iron potable water main, jack and bore 81-LF of 24" steel casing under Union Pacific Railroad, service line reinstatements, and fire hydrant installations/replacements.
North Washington St Water Sanitation District
Rehabilitation work for existing 8", and 10" sanitary sewer including approx. 3,022 linear feet (LF) of 8" and 1,239 LF of 10" cured-in-place pipe and service line reinstatements.
Posted Date
Jun 19, 2025
Due Date
Jul 15, 2025
Release: Jun 19, 2025
North Washington St Water Sanitation District
Close: Jul 15, 2025
Rehabilitation work for existing 8", and 10" sanitary sewer including approx. 3,022 linear feet (LF) of 8" and 1,239 LF of 10" cured-in-place pipe and service line reinstatements.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from North Washington St Water Sanitation District
The regular meeting of the Board of Directors was cancelled. The board announced the next scheduled meeting date.
The agenda includes the review of financial matters such as checks written, and various action items including updates on water and sewer systems, Denver Water and Metro Recovery issues, and pay applications for the York Phase II/58th projects. It also addresses the Washington water line replacement bids, legal matters concerning the sewer easement for the Thornton lift station, and an executive session to discuss strategy and receive legal advice regarding the Maiker Affordable Housing development and sewer main improvement project.
Extracted from official board minutes, strategic plans, and video transcripts.
Track North Washington St Water Sanitation District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge