Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
North Sagamore Water District
The Work consists of regrading an area of approximately 12,500 square feet immediately to the east and north of the existing Black Pond Well Pump Station. The Work also consists of regrading the existing access road (gravel) to level off low spots and re-establish a clear width of 12 feet along its entire length (approximately 450 feet). Dense graded crushed stone shall be placed the regraded access road as specified and as shown on the drawings.
Posted Date
Jul 8, 2026
Due Date
Jul 24, 2026
Release: Jul 8, 2026
North Sagamore Water District
Close: Jul 24, 2026
The Work consists of regrading an area of approximately 12,500 square feet immediately to the east and north of the existing Black Pond Well Pump Station. The Work also consists of regrading the existing access road (gravel) to level off low spots and re-establish a clear width of 12 feet along its entire length (approximately 450 feet). Dense graded crushed stone shall be placed the regraded access road as specified and as shown on the drawings.
AvailableNorth Sagamore Water District
Work consists of removal, inspection and reinstallation of the well pump; inspecting and videoing the well; cleaning and redevelopment of the well; motor testing; and pump testing for the beach well and church lane well. The beach well is a 52 feet deep, 24-inch diameter gravel packed well with 18-inch diameter liner screen and casing and design pumping rate of 500 gpm. The church lane well is a 190 feet deep, 16-inch diameter gravel packed well with design pumping rate of 700 gpm.
Posted Date
Aug 6, 2025
Due Date
Sep 17, 2025
Release: Aug 6, 2025
North Sagamore Water District
Close: Sep 17, 2025
Work consists of removal, inspection and reinstallation of the well pump; inspecting and videoing the well; cleaning and redevelopment of the well; motor testing; and pump testing for the beach well and church lane well. The beach well is a 52 feet deep, 24-inch diameter gravel packed well with 18-inch diameter liner screen and casing and design pumping rate of 500 gpm. The church lane well is a 190 feet deep, 16-inch diameter gravel packed well with design pumping rate of 700 gpm.
North Sagamore Water District
Replacement of Hydrants and Main line valves.
Posted Date
Apr 30, 2025
Due Date
May 15, 2025
Release: Apr 30, 2025
North Sagamore Water District
Close: May 15, 2025
Replacement of Hydrants and Main line valves.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from North Sagamore Water District
The board conducted a public hearing regarding the implementation of the classification act for fiscal year 2026, ultimately adopting a factor of one. Discussions included a change order for the Speakman Excavating Williston Road project, the authorization of a SCADA maintenance contract with Wright Pierce, and a quote for valve replacement at the treatment plant. Furthermore, the board explored using remaining MassWorks Grant funds for driveway repairs and addressed challenges related to scheduling annual backflow testing at specific residential locations.
The Board reviewed and approved the FY26 budget and capital articles. Updates regarding Dig It Construction were discussed, and a letter to the Town of Bourne regarding late tax turnovers was approved. The Board also reviewed and finalized wording for the FY2026 Annual District Meeting Warrant. Additionally, there was a discussion regarding the Hunters Brook Road Project, focusing on the need for updated project plans and improved communication with the local Planning Board.
The Board reviewed the fiscal year 2023 audit and discussed potential interest rate improvements and investment strategy adjustments for OPEB and stabilization accounts. Discussions were held regarding the ongoing meter change-out program, potential fee increases for seasonal water services, and the assessment of meters requiring relocation. The Board also reviewed the annual district insurance policy, discussed potential fire protection infrastructure improvements including interconnection and valve installation, and approved lighting upgrades at the office and plant. Additionally, the Board received updates on the final paving for the water main project, the acquisition of a new district truck, the status of the service line inventory, and outstanding account balances and lien processes.
The Board discussed new water service applications for a property involving a detached accessory dwelling unit and potential site review requirements. Key topics included ongoing drought conditions and potential water conservation strategies, as well as adjustments to District rates and regulations regarding accessory dwelling units, backflow testing, and delinquency procedures. Additionally, the Board reviewed town turnovers, the relocation of a fire hydrant, the status of the upcoming budget and capital plan, and the superintendent's report concerning repair bill liabilities, grant-funded infrastructure priorities, contractor project completion, and personnel desk duty limitations.
The Board appointed a new Superintendent, discussed water service issues at 43 Crowell Road, and received updates on the hydrant replacement project, Dig-It construction, and potential property purchase at 0 Church Lane. Additional topics included monitoring water usage at 1 Homestead Road, the Superintendent's report covering well cleaning, flow meter installations, tank repairs, and treatment plant valve replacements. The Board also discussed office repairs, hydrant meter policies, and administrative reports including account balances and gas card updates.
Extracted from official board minutes, strategic plans, and video transcripts.
Track North Sagamore Water District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge