Cub River Wetland Mitigation Site Project
Posted
Aug 15, 2026
Sep 21, 2026
The project consists of construction of wetland emergent marsh, woody riparian, and pond areas; a flood control berm; culverts with flap gates; a culvert with con- trol gate; a rail fence; landscape seeding; landscape shrub and tree planting; and placing fill material in farm field areas.
