Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of North Logan
Sunrise Engineering, on behalf of North Logan City, is soliciting sealed bids for the BST South and Powerline Trail Waterline Extension project. The project involves constructing two new pressurized waterlines within North Logan, Utah, with one alignment following the Bonneville Shoreline Trail corridor and the other extending along an existing Rocky Mountain Power corridor. The work includes installation of HDPE fused pipe, tie-ins to the existing municipal water system, and installation of a pressure-reducing valve vault.
Posted Date
-
Due Date
Aug 5, 2026
City of North Logan
Close: Aug 5, 2026
Sunrise Engineering, on behalf of North Logan City, is soliciting sealed bids for the BST South and Powerline Trail Waterline Extension project. The project involves constructing two new pressurized waterlines within North Logan, Utah, with one alignment following the Bonneville Shoreline Trail corridor and the other extending along an existing Rocky Mountain Power corridor. The work includes installation of HDPE fused pipe, tie-ins to the existing municipal water system, and installation of a pressure-reducing valve vault.
AvailableCity of North Logan
Construction of a PRV vault, approx. 4,400 feet of 12" distribution pipeline, approx. 2,600 feet of 16" supply line, and all associated appurtenances.
Posted Date
-
Due Date
May 12, 2025
City of North Logan
Close: May 12, 2025
Construction of a PRV vault, approx. 4,400 feet of 12" distribution pipeline, approx. 2,600 feet of 16" supply line, and all associated appurtenances.
City of North Logan
Construction of a AWWA D115 post-tensioned 4.0-million-gallon concrete water storage tank and a concrete valve bunker. This contract will include all the site work for these two structures. The interconnecting piping will consist of an 18" overflow pipeline, overflow ditch, overflow pond, 12" supply line (stubbed for future water sources), 16" supply line (connect to proposed system), and a 12" distribution line (connect to existing system). This contract will be accompanied by a separate contract to complete the full pipeline alignments for the 12" distribution line and 16" supply line.
Posted Date
-
Due Date
May 12, 2025
Release: -
City of North Logan
Close: May 12, 2025
Construction of a AWWA D115 post-tensioned 4.0-million-gallon concrete water storage tank and a concrete valve bunker. This contract will include all the site work for these two structures. The interconnecting piping will consist of an 18" overflow pipeline, overflow ditch, overflow pond, 12" supply line (stubbed for future water sources), 16" supply line (connect to proposed system), and a 12" distribution line (connect to existing system). This contract will be accompanied by a separate contract to complete the full pipeline alignments for the 12" distribution line and 16" supply line.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: No evidence this path is used; steer to competitive solicitation.
Coops: Frequently procures through OMNIA Partners and NASPO ValuePoint, and Utah statewide contracts via U3P; you can gain access to OMNIA Partners and NASPO ValuePoint through the Starbridge reseller & contract-vehicle platform — reach out to your Starbridge contact to pursue onboarding.
Entity: City of North Logan (UT)
Evidence/Thresholds: No documented use of sole source and no published dollar thresholds identified.
Board meetings and strategic plans from City of North Logan
The City Council meeting covered several operational and legislative updates. A staff member from the Parks Department was recognized for exemplary service. The Public Safety Chief provided a recap of recent call statistics and discussed a unique lightning-induced fire incident. A significant portion of the meeting focused on legislative updates, specifically Senate Bill 215, which necessitates an RFP process for EMS licensing, and House Bill 48, regarding Wildland Urban Interface (WUI) zones and associated fire protection assessments. The Council discussed the impact of state-mandated fire risk assessments and the city's approach to adopting necessary ordinances and zone maps to comply with state requirements while minimizing financial burdens on residents.
The meeting included an update on city council approvals regarding text amendments to the 2500 North Gateway Corridor and the Harvest Acres subdivision development agreement. A primary agenda item was a public hearing regarding the Ashbor Mixed-Use City Center Rezone Master Development Plan, where the city staff provided a historical context of city center planning efforts and detailed the proposed zoning change from single-family residential to city center mixed-use. The commission reviewed the site plan, including intended building types and aesthetic requirements, and discussed the necessity for further review of traffic impact studies and parking considerations for the project.
The City Council meeting featured the recognition of an exemplary staff member and the presentation of a proclamation expressing gratitude to the Utah State Legislature for funding wildfire prevention and emergency infrastructure. The council reviewed various strategic initiatives, including park improvements, street maintenance, water and sewer projects, and planning for new construction. Key agenda items included the appointment of a new member to the Planning Commission and a public hearing regarding revisions to the fiscal year 2026 municipal budget, which involved reallocating impact fee funding and approving costs for a new cemetery shed.
The council recognized an exemplary staff member for their contribution to a community event. Public safety reports were provided, touching on firework safety, police operations, and ongoing concerns regarding e-bike traffic. The meeting included a review of various strategic directives and capital projects, including updates on water infrastructure, sewer master planning, street maintenance, storm water ponds, the 200 East construction project, trail easements, and park developments. Additionally, recreation department planning for Pioneer Day was discussed. A budget officer statement outlined a proposed property tax increase for the upcoming fiscal year to fund police salary adjustments, fire department contract obligations, and new community center utility costs.
The meeting included the approval of an agenda and the introduction of a new alternate planning commissioner. Key discussion topics included a conditional use permit for a preschool expansion, legislative amendments regarding the 2500 North Gateway Corridor zoning, and the preliminary plat review for the Harvest Acres subdivision, an 11-lot single-family development utilizing density bonus mechanisms.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of North Logan's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge