Carbon Dioxide Scrubber Pre-Arrival Testing/Inspection - (Request for Quote)
Jul 31, 2026
Closes
Aug 3, 2026
Travel to jobsite and meet with the NNSY POC USS California PATs Coordinator. Contractor to perform Pre-Availability Testing of the CO2 Scrubber Plants 1 & 2 in accordance with reference 2.3 aboard the USS CALIFORNIA SSN-781. Notify NNSY PAT Coordinator within 8-hr timeframe to provide crane/rigging/forklift services as required. Testing to include visual inspection and measurements, operational and electrical testing and troubleshooting, and temperature/pressure evaluation. See attached file.