NASA Marshall Space Flight Center posted an active presolicitation, Notice ID 80MSFC26R0001, for 20 commercial off-the-shelf IT software and rackmount system packages. The requirement includes NightStar Tools software, NightStar Tools yearly maintenance, iHawk rackmount systems, and iHawk yearly maintenance, with RedHawk Linux software maintenance and related hardware return-to-factory service. NASA/MSFC states that it intends to award a sole-source contract to Concurrent Real-Time, Inc.; the SAM.gov notice describes a procurement rather than a grant.
NASA is seeking inquiries from companies interested in obtaining exclusive or nonexclusive license rights to commercialize, manufacture, and market a universal wireless gateway developed at Armstrong Flight Research Center. The gateway uses a software-defined radio to connect wireless sensors with existing aircraft systems, enabling rapid sensor integration while reducing cabling, weight, and costs. This is a special notice for preliminary market research and licensing interest, not a grant program or a procurement for follow-on work.
This open Special Notice is a NASA Technology Transfer Program licensing opportunity, not a grant program or a purchase of goods or services. NASA is offering exclusive or nonexclusive commercial license rights for a mobile bipedal robotic system that autonomously assembles, monitors, repairs, and reconfigures lightweight lattice-based structures. Interested companies must submit a license application through NASA’s Automated Technology Licensing Application System by August 10, 2027, and no follow-on procurement is expected from responses.
Definitive Contract to University of Hawaii by NASA Marshall Space Flight Center for Research And Development In The Physical, Engineering, And Life Sciences
Effective: Jul 2, 2026Expires: Sep 30, 2026Expiration date locked.Unlock
L-MAPS IS A MICROWAVE SPECTROMETER WITH A DLR-CONTRIBUTED GROUND PENETRATING RADAR SUBSYSTEM USED TO MEASURE SUBSURFACE STRUCTURE, TEMPERATURES, AND ID SUBSURFACE ICE. THIS WORK SUPPORTS THE LUNAR TERRAIN VEHICLE INSTRUMENTS (LTVI) PROGRAM.
Definitive Contract to Arizona Board of Regents by NASA Marshall Space Flight Center for Research And Development In The Physical, Engineering, And Life Sciences
Effective: Jul 13, 2026Expires: Sep 30, 2026Expiration date locked.Unlock
EMILIA 3-D DEVELOPS A LUNAR SURFACE IMAGING PAYLOAD INTEGRATING THERMAL AND STEREO CAMERAS TO MAP REGOLITH PROPERTIES, SURFACE ROUGHNESS, HEAT FLOW, AND EXPLORATION IMPACTS FOR NASA SCIENCE.
Definitive Contract to The Boeing Company by NASA Marshall Space Flight Center for Guided Missile And Space Vehicle Manufacturing
Effective: Sep 1, 2007Expires: Sep 30, 2026Expiration date locked.Unlock
PROVIDE DEVELOPMENTAL HARDWARE AND TEST ARTICLES, AND MANUFACTURE AND ASSEMBLE ARES I UPPER STAGES. THE UPPER STAGE (US) ELEMENT IS AN INTEGRAL PART OF THE ARES I LAUNCH VEHICLE AND PROVIDES THE SECOND STAGE OF FLIGHT. THE US ELEMENT IS RESPONSIBLE FOR THE ROLL CONTROL DURING THE FIRST STAGE BURN AND SEPARATION; AND WILL PROVIDE THE GUIDANCE AND NAVIGATION, COMMAND AND DATA HANDLING, AND OTHER AVIONICS FUNCTIONS FOR THE ARES I DURING ALL PHASES OF THE ASCENT FLIGHT. THE US ELEMENT IS A NEW DESIGN THAT EMPHASIZES SAFETY, OPERABILITY, AND MINIMUM LIFE CYCLE COST. THE OVERALL DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E), PRODUCTION, AND SUSTAINING ENGINEERING EFFORTS INCLUDE ACTIVITIES PERFORMED BY THREE ORGANIZATIONS; THE NASA DESIGN TEAM (NDT), THE UPPER STAGE PRODUCTION CONTRACTOR (USPC) AND THE INSTRUMENT UNIT PRODUCTION CONTRACTOR (IUPC). FOR CLARITY, THE USPC WILL BE REFERRED TO AS THE CONTRACTOR THROUGHOUT THIS DOCUMENT. NASA IS RESPONSIBLE FOR THE INTEGRATION OF THE PRIMARY ELEMENTS OF THE ARES I LAUNCH VEHICLE INCLUDING: THE FIRST STAGE, US INCLUDING INSTRUMENT UNIT (IU), AND US ENGINE; AND WILL ALSO INTEGRATE THE ARES I LAUNCH VEHICLE AT THE LAUNCH SITE. NASA IS RESPONSIBLE FOR THE DDT&E, INCLUDING TECHNICAL AND PROGRAMMATIC INTEGRATION OF THE US SUBSYSTEMS AND GOVERNMENT-FURNISHED PROPERTY. NASA WILL LEAD THE EFFORT TO DEVELOP THE REQUIREMENTS AND SPECIFICATIONS OF THE US ELEMENT, THE DEVELOPMENT PLAN AND TESTING REQUIREMENTS, AND ALL DESIGN DOCUMENTATION, INITIAL MANUFACTURING AND ASSEMBLY PROCESS PLANNING, LOGISTICS PLANNING, AND OPERATIONS SUPPORT PLANNING. DEVELOPMENT, QUALIFICATION, AND ACCEPTANCE TESTING WILL BE CONDUCTED BY NASA AND THE CONTRACTOR TO SATISFY REQUIREMENTS AND FOR RISK MITIGATION. NASA IS RESPONSIBLE FOR THE OVERALL UPPER STAGE VERIFICATION AND VALIDATION PROCESS AND WILL REQUIRE SUPPORT FROM THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR THE MANUFACTURE AND ASSEMBLY OF THE UPPER STAGE TEST FLIGHT AND OPERATIONAL UPPER STAGE UNITS INCLUDING THE INSTALLATION OF UPPER STAGE INSTRUMENT UNIT, THE GOVERNMENT-FURNISHED US ENGINE, BOOSTER SEPARATION MOTORS, AND OTHER GOVERNMENT-FURNISHED PROPERTY. A DESCRIPTION OF THE NASA MANAGED AND PERFORMED EFFORTS IS CONTAINED IN THE US WORK PACKAGES AND WILL BE MADE AVAILABLE TO THE CONTRACTOR TO ENSURE THEIR UNDERSTANDING OF THE ROLES AND RESPONSIBILITIES OF THE NDT, IUPC, AND CONTRACTOR DURING THE DESIGN, DEVELOPMENT, AND OPERATION OF THE US ELEMENT. THE US CONCEPTUAL DESIGN DESCRIBED IN THE USO-CLV-SE-25704 US DESIGN DEFINITION DOCUMENT (DDD) IS THE BASELINE DESIGN FOR THIS CONTRACT. THE CONTRACTORS EARLY ROLE WILL BE TO PROVIDE PRODUCIBILITY ENGINEERING SUPPORT TO NASA VIA THE ESTABLISHED US OFFICE STRUCTURE AND TO PROVIDE INPUTS INTO THE FINAL DESIGN CONFIGURATION, SPECIFICATIONS, AND STANDARDS. NASA WILL TRANSITION THE MANUFACTURING AND ASSEMBLY, LOGISTICS SUPPORT INFRASTRUCTURE, CONFIGURATION MANAGEMENT, AND THE SUSTAINING ENGINEERING FUNCTIONS TO THE CONTRACTOR AT THE KEY POINTS DURING THE DEVELOPMENT AND IMPLEMENTATION OF THE PROGRAM CURRENTLY PLANNED TO OCCUR NO LATER THAN 90 DAYS AFTER THE COMPLETION OF THE FOLLOWING MAJOR MILESTONES: MANUFACTURING AND ASSEMBLY US PRELIMINARY DESIGN REVIEW (PDR) LOGISTICS SUPPORT INFRASTRUCTURE US PDR CONFIGURATION MANAGEMENT US CRITICAL DESIGN REVIEW CDR) SUSTAINING ENGINEERING US DESIGN CERTIFICATION REVIEW (DCR) AFTER THE COMPLETION OF AN ORDERLY TRANSITION OF ROLES AND RESPONSIBILITIES TO THE CONTRACTOR, NASA WILL ASSUME AN INSIGHT ROLE INTO THE CONTRACTORS PRODUCTION, SUSTAINING ENGINEERING, AND OPERATIONS SUPPORT OF THE ARES I US TEST PROGRAM AND FLIGHT HARDWARE. AFTER DCR, THE CONTRACTOR WILL BE RESPONSIBLE FOR SUSTAINING ENGINEERING PER SOW SECTION 4.7, AS NECESSARY TO MAINTAIN AND SUPPORT THE US CONFIGURATION AND FOR PRODUCTION AND OPERATIONS SUPPORT.
Definitive Contract to Arizona Board of Regents by NASA Marshall Space Flight Center for Research And Development In The Physical, Engineering, And Life Sciences
Effective: Mar 16, 2010Expires: Sep 30, 2026Expiration date locked.Unlock
OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO.
Definitive Contract to ENSCO, Inc. by NASA Marshall Space Flight Center for All Other Professional, Scientific, And Technical Services
Effective: Aug 20, 2020Expires: Sep 30, 2026Expiration date locked.Unlock
SHORT-TERM PREDICTION RESEARCH AND TRANSITION (SPORT) PROJECT
Key Contacts
Public-sector contacts connected to NASA Marshall Space Flight Center.