Fort Plain Pump Station Generator Replacement Contract No. 1 - Electrical Construction RFP
Posted
Sep 29, 2026
Oct 22, 2026
Work for Contract No. 1 - Electrical Construction will consist of replacement of the existing 150 KW fuel oil generator at the Fort Plain Pump Station and connection of select existing electrical loads at the WWTP to the emergency electrical system, including disconnection of the existing pump station generator and automatic transfer switch from the existing electrical system, removal and disposal of some components from the pump station site, installation of a new 150 KW natural gas powered generator outside the pump station building, installation of a new ATS inside the pump station building, disconnection of an existing low voltage switchboard at the WWTP, removal and disposal of an existing low voltage switchboard from the WWTP, installation of a new low voltage switchboard at the WWTP (including connection of the existing switchboard loads to the new switchboard), disconnection of an existing panelboard from the existing normal bus, connection of an existing panelboard to the new low voltage switchboard, disconnection of existing electrical loads from the existing normal bus, connection of existing electrical loads to the existing emergency bus, as well as all associated electrical work including wiring, conduits, excavation, backfill, grounding, bonding, circuit breakers, junction boxes, raceways, hangers and supports, enclosures, control wiring, testing, and equipment commissioning, all as further detailed in the plans and specifications. This contract also includes removal of the existing 550-gallon buried fuel tank at the pump station, furnishing and installation of gas piping from the meter to the generator (including a line regulator), furnishing and installation of an elevated concrete slab and adjacent stairs for the pump station generator, furnishing and installation of an extension of the existing chain link fence around the station (including removal of a portion of the existing fence), furnishing and installation of concrete pads for the proposed switchboard, dust control, temporary erosion and sediment controls, survey and stakeout, and all bypass pumping necessitated by work of this Contract.