Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Mobile County Water Sewer Fire Protection Authority
The work consists primarily of electrical and plumbing inspections of existing conditions for an owner installed sewer grinder station, installation of the electrical and plumbing connections for a grinder station, and closure of septic tanks and containers.
Posted Date
Feb 12, 2026
Due Date
Feb 25, 2026
Release: Feb 12, 2026
Mobile County Water Sewer Fire Protection Authority
Close: Feb 25, 2026
The work consists primarily of electrical and plumbing inspections of existing conditions for an owner installed sewer grinder station, installation of the electrical and plumbing connections for a grinder station, and closure of septic tanks and containers.
AvailableMobile County Water Sewer Fire Protection Authority
Work consist of 28 SY of bituminous wearing surface for driveways, 18 LF of curb and gutter replacement, 63 SY of replacement of concrete sidewalks, 103 SY of temporary asphalt patch, 7 LF of 6" DI (cl 50) water main (restrained joint), 658 LF of 10" PVC c900 (dr18) water main, 222 LF of 10" di (restrained joint), 311 lb of DI fittings, 3 EA of 6" DI retainer gland, 15 EA of 10" DI retainer gland, 6 EA of 10" DI retainer gland (joint restraint), 1 CY of concrete for water mains, 1 EA of 6" gate valve with box, 1 EA of fire hydrant. See attached file.
Posted Date
Aug 8, 2025
Due Date
Aug 27, 2025
Release: Aug 8, 2025
Mobile County Water Sewer Fire Protection Authority
Close: Aug 27, 2025
Work consist of 28 SY of bituminous wearing surface for driveways, 18 LF of curb and gutter replacement, 63 SY of replacement of concrete sidewalks, 103 SY of temporary asphalt patch, 7 LF of 6" DI (cl 50) water main (restrained joint), 658 LF of 10" PVC c900 (dr18) water main, 222 LF of 10" di (restrained joint), 311 lb of DI fittings, 3 EA of 6" DI retainer gland, 15 EA of 10" DI retainer gland, 6 EA of 10" DI retainer gland (joint restraint), 1 CY of concrete for water mains, 1 EA of 6" gate valve with box, 1 EA of fire hydrant. See attached file.
Mobile County Water Sewer Fire Protection Authority
Provide water meters.
Posted Date
Jul 9, 2025
Due Date
Jul 30, 2025
Release: Jul 9, 2025
Mobile County Water Sewer Fire Protection Authority
Close: Jul 30, 2025
Provide water meters.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Mobile County Water Sewer Fire Protection Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Mobile County Water Sewer Fire Protection Authority's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database