Water Tank Demolition and Removal Project
Aug 1, 2026
Closes
Aug 12, 2026
Bid Schedule A: Demolish and Remove Existing Clearwell and Backwash Holding Tank; Demolish and Remove Existing Valve Pit and Appurtenances ; Remove and Dispose (1) 2'x3' Type B Inlet & 18 LF 15" RCP; Remove and Dispose 235 LF 30" DIP * Remove and Dispose 22 LF 20" DIP; Remove and Dispose 30 LF 12" DIP * Remove and Dispose 1,099 LF Curb & Gutter; Remove and Dispose 1,993 SY Asphalt Surfacing and Base Course; Remove and Dispose 95 SY Concrete Surfacing; Furnish and Install 180 TN 6” Temporary Gravel Surfacing; Alternate 1: Structural Fill Install 5,300 CY of City Furnished Structural Fill; Alternate 2: Granular Fill; Install 5,300 CY of Contractor Furnished Granular Fill
