Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
National Center for Education Statistics identifier.
Total number of schools in the district.
School mascot.
Total number of staff members.
Highest grade level offered.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Milton Area School District
Work includes removal of existing carpet and installation of glue-down luxury vinyl plank or tile flooring. The project includes approx: 3,445 SF in the library and 1489 SF across three offices. Includes removal and legal disposal of existing carpet and related materials removal of adhesive and preparation of subfloor; moisture testing and mitigation if required; surface leveling and patching as necessary; installation of glue-down LVP in specified pattern; installation of transition strips and base adjustments; protection of adjacent finishes; final cleaning.
Posted Date
Feb 17, 2026
Due Date
Mar 17, 2026
Release: Feb 17, 2026
Milton Area School District
Close: Mar 17, 2026
Work includes removal of existing carpet and installation of glue-down luxury vinyl plank or tile flooring. The project includes approx: 3,445 SF in the library and 1489 SF across three offices. Includes removal and legal disposal of existing carpet and related materials removal of adhesive and preparation of subfloor; moisture testing and mitigation if required; surface leveling and patching as necessary; installation of glue-down LVP in specified pattern; installation of transition strips and base adjustments; protection of adjacent finishes; final cleaning.
AvailableMilton Area School District
Work includes removal of existing carpet and installation of glue-down luxury vinyl plank or tile flooring. The project includes approx: 4,900 SF in the lit cafe and 1,175 SF across seven offices. Includes removal and legal disposal of existing carpet and related materials removal of adhesive and preparation of subfloor; moisture testing and mitigation if required; surface leveling and patching as necessary; installation of glue-down LVP in specified pattern; installation of transition strips and base adjustments; protection of adjacent finishes; final cleaning.
Posted Date
Feb 17, 2026
Due Date
Mar 17, 2026
Release: Feb 17, 2026
Milton Area School District
Close: Mar 17, 2026
Work includes removal of existing carpet and installation of glue-down luxury vinyl plank or tile flooring. The project includes approx: 4,900 SF in the lit cafe and 1,175 SF across seven offices. Includes removal and legal disposal of existing carpet and related materials removal of adhesive and preparation of subfloor; moisture testing and mitigation if required; surface leveling and patching as necessary; installation of glue-down LVP in specified pattern; installation of transition strips and base adjustments; protection of adjacent finishes; final cleaning.
AvailableMilton Area School District
Purchase and installation of a walk-in cooler/freezer combination box. Project involves site preparation, demolition of the existing walk-in cooler/freezer, construction of a new exterior concrete pad, and installation of the new combination box. The existing indoor combination box is being used at its maximum capacity and is inefficient to access for deliveries and cafeteria staff.
Posted Date
Jan 23, 2025
Due Date
Feb 7, 2025
Release: Jan 23, 2025
Milton Area School District
Close: Feb 7, 2025
Purchase and installation of a walk-in cooler/freezer combination box. Project involves site preparation, demolition of the existing walk-in cooler/freezer, construction of a new exterior concrete pad, and installation of the new combination box. The existing indoor combination box is being used at its maximum capacity and is inefficient to access for deliveries and cafeteria staff.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Milton Area School District
The document details the Wind Ensemble Winter Concert. Discussions included instructions for the audience regarding applause during the multi-movement Nutcracker Ballet performance. Key musical pieces featured were excerpts from The Nutcracker Ballet, "Nessun Dorma" from Turandot featuring a euphonium solo, "Heyman Christmas Swings," the high school-only piece "Sleigh Ride" (noting its difficulty and originality from 1948), and the finale, "Ukrainian Bell Carol" in the style of heavy metal, played with the middle schoolers joining. Recognition was given to student soloists and ensemble members for district band/orchestra selections, including specific acknowledgment of student-created props and dedication of the entire performance to months of hard work across various ensembles (marching band, jazz band) and the support from administration, school board, teachers, and parents.
The event is an annual mass singer assembly featuring students and staff performing anonymously, with clues provided in introductions to help judges and the audience guess their identities. Key segments included multiple performances (Dino, Marshmallow Man, Shark, Gingerbread Man, Snowman, Beetlejuice, Mr. Bear) followed by judge deliberations and audience polling. The event also included recognition and prize distribution for winners of spirit days held earlier in the week, such as Christmas Pajamas and JC Penney Family Photos.
The meeting included discussions and a presentation on vaping incidents in schools, including the increase in middle school, and measures being taken such as out-of-school suspensions, online classes, and testing vapes for controlled substances. There was also a facilities committee update with progress on construction, routing sewer lines, and framing.
The meeting included presentations from the athletic boosters, band boosters, and stage. The athletic boosters discussed their revenue and expenditures, including sponsoring EOS Awards and senior scholarships. The band boosters highlighted their summer activities, upcoming events, new instruments, and fundraising efforts. Stage discussed their mission to support students in vocal and theater arts, including cleaning the stage, various fundraisers, and participation numbers in different ensembles.
The meeting of the Milton Area School Board included presentations and discussions regarding the Pinpoint Wellness Center. Topics included the history of the wellness center, fundraising efforts, and future plans for its operation. The board considered options for staffing, hours of operation, community access, and potential fee structures. The impact of the wellness center and the expertise of the trainer on the athletic program and student body were also discussed.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Milton Area School District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database