1578 34th Ave. SW, Cambridge Renovation(Request for Proposal)
Posted
Sep 28, 2026
Oct 14, 2026
Work includes Interior: Lower Level Bathroom: Remove toilet and vanity. Save for re-installation; Demo Drywall on the wall between the toilet and vanity. Demo grid ceiling and tiles. Protect utilities from damage; Demo concrete floor and ceramic tile as needed to move toilet drain flange location shown on bathroom plan; Rough-in toilet to new location waste, vent, and cold water supply. Demo drywall as needed to install plumbing; Exterior: Deck Repairs: Demo and dispose of existing Deck railings and deck boards; Install deck tension ties. (Existing lower level truss system is open for rod tie connections.)Interior: Lower Level Bedroom: Install electrical rough in including receptacles, light fixture w/switch, and smoke detector; Drywall ceiling and upper walls. Fur out masonry walls, insulate and drywall. Install drywall ledge cap. Tape, sand, prime and paint. Orange Peel ceiling finish.