Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Metropolitan Sewerage District
Work includes approx 48,913 LF of 36"-60" pre-clean inspection (cctv); 9,952 LF of 36"-48" heavy cleaning; 24,456 LF of 36"-40" final inspection (cctv).
Posted Date
Jun 28, 2026
Due Date
Jul 30, 2026
Release: Jun 28, 2026
Metropolitan Sewerage District
Close: Jul 30, 2026
Work includes approx 48,913 LF of 36"-60" pre-clean inspection (cctv); 9,952 LF of 36"-48" heavy cleaning; 24,456 LF of 36"-40" final inspection (cctv).
AvailableMetropolitan Sewerage District
Work includes approx 80 LF of 4" PVC (SCH 40) all depths, including bedding; 36 EA replace manhole frame and cover; 10 LF of concrete curb and gutter replacement; 11,892 LF of 8" lining via fold and formed PVC pipe or cured-in-place-pipe (CIPP) ; 301 VF cementitious liner applied to existing manholes; 40 EA 4" service lateral liner in lieu of remote cut method.
Posted Date
Jun 28, 2026
Due Date
Jul 30, 2026
Release: Jun 28, 2026
Metropolitan Sewerage District
Close: Jul 30, 2026
Work includes approx 80 LF of 4" PVC (SCH 40) all depths, including bedding; 36 EA replace manhole frame and cover; 10 LF of concrete curb and gutter replacement; 11,892 LF of 8" lining via fold and formed PVC pipe or cured-in-place-pipe (CIPP) ; 301 VF cementitious liner applied to existing manholes; 40 EA 4" service lateral liner in lieu of remote cut method.
AvailableMetropolitan Sewerage District
Procurement and installation of a new 10' diameter duplex submersible sanitary sewer lift station (expandable to a triplex lift station), wastewater grinder inside a dedicated 5' diameter manhole, approx 20 LF of 24" and 2,640 LF of 16" HDPE DR 11 force main (approx 440 LF of which will be encased in a 24" HDPE DR 11 to be installed by horizontal directional drill), approx 550 LF of 12" and 410 LF of 24" PVC C900 gravity sewer, and 30 LF of 30" DIP gravity sewer, including manholes and all related appurtenances. The project also includes construction of approx 800 LF of upper access road and an extension of the lower access road from the existing access road.
Posted Date
-
Due Date
Jul 21, 2026
Release: -
Metropolitan Sewerage District
Close: Jul 21, 2026
Procurement and installation of a new 10' diameter duplex submersible sanitary sewer lift station (expandable to a triplex lift station), wastewater grinder inside a dedicated 5' diameter manhole, approx 20 LF of 24" and 2,640 LF of 16" HDPE DR 11 force main (approx 440 LF of which will be encased in a 24" HDPE DR 11 to be installed by horizontal directional drill), approx 550 LF of 12" and 410 LF of 24" PVC C900 gravity sewer, and 30 LF of 30" DIP gravity sewer, including manholes and all related appurtenances. The project also includes construction of approx 800 LF of upper access road and an extension of the lower access road from the existing access road.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Metropolitan Sewerage District
The Board discussed the preliminary budget for FY 2026-27, which includes a 7% sewer rate increase to fund the 10-year Capital Improvement Plan. Reports from various committees were presented, including personnel budget recommendations, right-of-way matters, and the CIP budget. The General Manager's report covered project updates, including sewer extensions in the Candler area, and the upcoming recruitment process for a new General Manager. The Board approved a resolution adopting the preliminary budget and the schedule of sewer rates and fees, as well as a consolidated motion agenda covering condemnation, compensation budgets, and developer-constructed sewer systems.
The Board discussed the potential removal of the Craggy Dam, focusing on a phased approach that begins with an independent valuation and involves collaboration to protect ratepayers and infrastructure, specifically addressing the 66-inch interceptor. Updates were provided on committee reports including personnel succession planning, developer-constructed sewer systems, auditing contracts, and revised purchasing policies. The Board also reviewed the 10-year Capital Improvement Program, focusing on treatment plant and pump station projects, master planning updates, and ongoing sewer rehabilitation efforts.
The board discussed the potential sale and removal of the Craggy Dam, focusing on environmental, safety, and economic impacts. The general manager emphasized the need for further due diligence, including independent financial appraisals and engineering assessments, to protect ratepayers and bond holders. Additionally, the board received updates on ongoing construction projects such as the Carrier Bridge Pump Station crossing and the Weaverville Pump Station, reviewed budget amendments, and approved various developer-constructed sewer systems.
The agenda includes a review of the third-quarter budget to actual performance for the fiscal year, a proposal for employee pay adjustments, and a review of the self-insured health plan. Additionally, the committee discussed the ten-year Capital Improvement Program, including priorities for collection system rehabilitation, pump station replacements, and water reclamation facility upgrades. The meeting also addressed financial forecasting, sewer rate survey data, and the proposed budget and sewer rates for the upcoming fiscal year.
The board meeting covered several critical infrastructure and financial topics. Key discussions included a detailed review of the Solids Handling Preliminary Engineering Report, which evaluates sludge management and promotes transitioning to thermal drying technology for long-term redundancy and capacity improvement. The board approved an owner's advisor contract to support these solids handling improvements. Additionally, the board considered and approved various infrastructure project contracts, including the Clayton Road Pump Station standpipe replacement and the West City View at Riverside Drive project. Developer-constructed sewer systems for multiple residential developments were accepted. Finally, the board approved a significant budget amendment for the Carrier Bridge Pump Station project to account for increased construction productivity and established a reimbursement resolution for future bond-financed projects.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Metropolitan Sewerage District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge