Mendota, IL - 9th Avenue Bridge Replacement over Mendota Creek
Posted
-
Oct 12, 2026
Work shall consist of removal of single span steel beam bridge with closed abutments and construction of a two (2) cell cast-in-place box culvert. Also included is utility replacement/adjustment, HMA approach work, erosion control measures, seeding and other related items. The gross and net length of the project is 59.96 ft (0.01 mi.).
