IS-195 (Metropolitan Boulevard) from the MD 295 Interchange to the Baltimore County Line Slope Protection
Posted
Sep 8, 2026
Oct 15, 2026
Work includes includes slope stabilization measures to address slope erosion; install intercepting side ditches (intercept swales with a clay core) to capture roadway runoff, prevent seepage, and direct drainage to stable outfalls; construct new outfalls and repair an existing damaged outfall to improve the drainage system; stabilize larger eroded slopes using geotextile inclusions with embankment borrow; repair smaller erosion rills using fiber rolls with embankment borrow; installing compliant traffic barriers and end treatments.
