Basin E Sewer Rehabilitation
Posted
Aug 26, 2026
Sep 18, 2026
Project includes installation of approx., 3,374 LF of 24" gravity sewer with 16 manholes, one open cut crossing of the little duck river, asphalt paving, erosion control, site restoration, and all incidentals required for the complete installation of the sewer main.
