Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Manchester-Boston Regional Airport - Engineering & Planning Office
Provide professional services related to upgrades to the Airport's HVAC system and replacements of the Airport's air handling units and rooftop units, and associated mechanical, electrical, and controls infrastructure at airport facilities.
Posted Date
May 29, 2026
Due Date
Jun 17, 2026
Release: May 29, 2026
Manchester-Boston Regional Airport - Engineering & Planning Office
Close: Jun 17, 2026
Provide professional services related to upgrades to the Airport's HVAC system and replacements of the Airport's air handling units and rooftop units, and associated mechanical, electrical, and controls infrastructure at airport facilities.
AvailableManchester-Boston Regional Airport - Engineering & Planning Office
This project consists of modifying the existing outbound baggage handling systems (bhs) equipment, including baggage belt conveyors and flat-plate makeup carousels and related electrical power and control systems for ticket counter #2 (tc-2) and ticket counter #4 (tc-4) within the existing airport terminal building.
Posted Date
Jun 14, 2024
Due Date
Jul 24, 2024
Release: Jun 14, 2024
Manchester-Boston Regional Airport - Engineering & Planning Office
Close: Jul 24, 2024
This project consists of modifying the existing outbound baggage handling systems (bhs) equipment, including baggage belt conveyors and flat-plate makeup carousels and related electrical power and control systems for ticket counter #2 (tc-2) and ticket counter #4 (tc-4) within the existing airport terminal building.
Manchester-Boston Regional Airport - Engineering & Planning Office
The work consists of 1 LS Airfield Lighting Vault Expansion; 1 LS As-Built Plans; 1 LS Aerial Photos; 1 LS Maintenance and Protection of Traffic; 1 LS Maintenance and Protection of Traffic; 805 LF Installation, Maintenance, and Removal of Silt Fence; 8 EA Installation, Relocation, and Removal of Inlet Protector; 1 EA Installation and Removal of Construction Entrance/Exit D; 1 LS Concrete Washout Area; 1 EA Bollards; 1 AL Contaminated Soil Removal and Replacement; 85 CY Gravel; 535 SY HMA Pavement Removal - 4" Nominal Depth; 125 SY HMA Pavement Removal - 13" Nominal Depth. See attached files
Posted Date
Mar 6, 2025
Due Date
Apr 2, 2025
Release: Mar 6, 2025
Manchester-Boston Regional Airport - Engineering & Planning Office
Close: Apr 2, 2025
The work consists of 1 LS Airfield Lighting Vault Expansion; 1 LS As-Built Plans; 1 LS Aerial Photos; 1 LS Maintenance and Protection of Traffic; 1 LS Maintenance and Protection of Traffic; 805 LF Installation, Maintenance, and Removal of Silt Fence; 8 EA Installation, Relocation, and Removal of Inlet Protector; 1 EA Installation and Removal of Construction Entrance/Exit D; 1 LS Concrete Washout Area; 1 EA Bollards; 1 AL Contaminated Soil Removal and Replacement; 85 CY Gravel; 535 SY HMA Pavement Removal - 4" Nominal Depth; 125 SY HMA Pavement Removal - 13" Nominal Depth. See attached files
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge