Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Lummi Public Works Department
Design, procure, and install two solar PV carport systems to support adjacent electric vehicle charging infrastructure. The project intent is to maximize on-site renewable energy generation and offset EV charging electrical consumption through Puget Sound Energy's net metering program.
Posted Date
May 22, 2026
Due Date
Jun 16, 2026
Release: May 22, 2026
Lummi Public Works Department
Close: Jun 16, 2026
Design, procure, and install two solar PV carport systems to support adjacent electric vehicle charging infrastructure. The project intent is to maximize on-site renewable energy generation and offset EV charging electrical consumption through Puget Sound Energy's net metering program.
AvailableLummi Public Works Department
Demolition of existing laundry facility and former R.V. Utilities, the site preparation, the construction of 24 new single-level tiny home cottages with 5 foundations for alternate no. 1 (base bid), one shared laundry /maintenance building, a new covered gathering space (exterior), access roads and parking with landscaping and amenities, and utilities reconnected to the existing office and existing cottage. Alternate no. 1a: complete unit #22-B structure above concrete slab, alternate no. 1b: complete unit #23-B structure above concrete slab, alternate no. 1c: complete unit #28-A structure above concrete slab, alternate #1d: complete unit #29-C structure above concrete slab, alternate 1e: complete unit #30-B structure above concrete slab, alternate 2: basketball court slab area lighting, hoop, paint lines, adjacent sidewalks & plantings, alternate 3: porch skylights at cottage units, alternate 4: built-in porch benches at cottage units, alternate 5: ladders for cottage unit lofts, alternate 6: bedroom walls & door shown at units A & B & D (dashed line), alternate 7: salmon BBQ pit at canopy area, alternate 8: add standing seam roofing in lieu of composite type.
Posted Date
May 13, 2024
Due Date
Jun 12, 2024
Release: May 13, 2024
Lummi Public Works Department
Close: Jun 12, 2024
Demolition of existing laundry facility and former R.V. Utilities, the site preparation, the construction of 24 new single-level tiny home cottages with 5 foundations for alternate no. 1 (base bid), one shared laundry /maintenance building, a new covered gathering space (exterior), access roads and parking with landscaping and amenities, and utilities reconnected to the existing office and existing cottage. Alternate no. 1a: complete unit #22-B structure above concrete slab, alternate no. 1b: complete unit #23-B structure above concrete slab, alternate no. 1c: complete unit #28-A structure above concrete slab, alternate #1d: complete unit #29-C structure above concrete slab, alternate 1e: complete unit #30-B structure above concrete slab, alternate 2: basketball court slab area lighting, hoop, paint lines, adjacent sidewalks & plantings, alternate 3: porch skylights at cottage units, alternate 4: built-in porch benches at cottage units, alternate 5: ladders for cottage unit lofts, alternate 6: bedroom walls & door shown at units A & B & D (dashed line), alternate 7: salmon BBQ pit at canopy area, alternate 8: add standing seam roofing in lieu of composite type.
Lummi Public Works Department
Project consists of addition to existing Early Learning Center. Single story, slab on grade, two classrooms, three offices, toilet facilities, storage and miscellaneous site work. Construct a single story, slab on grade, approx. 3,680 SF addition of two classrooms, three offices, restroom, storage, dumpster enclosure, and associated site work to the existing Lummi ELC childcare/head start building.
Posted Date
Apr 9, 2025
Due Date
May 8, 2025
Release: Apr 9, 2025
Lummi Public Works Department
Close: May 8, 2025
Project consists of addition to existing Early Learning Center. Single story, slab on grade, two classrooms, three offices, toilet facilities, storage and miscellaneous site work. Construct a single story, slab on grade, approx. 3,680 SF addition of two classrooms, three offices, restroom, storage, dumpster enclosure, and associated site work to the existing Lummi ELC childcare/head start building.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge