Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Liberty-Chesnee-Fingerville Water District
Project involves improvements to pump stations in two different areas. Area 1, Liberty Pump Station, includes the replacement of an existing pump with a new pump of the same size and capacity, modifications to an existing pump control valve, installation of a new stand-by, electrical generator, installation of a new automatic transfer switch, and various electrical upgrades. Area 2, Rainbow Lake Pump Station, includes the installation of a new stand-by electrical generator, automatic transfer switch, and upgrades to various electrical components.
Posted Date
Oct 15, 2024
Due Date
Nov 15, 2024
Release: Oct 15, 2024
Liberty-Chesnee-Fingerville Water District
Close: Nov 15, 2024
Project involves improvements to pump stations in two different areas. Area 1, Liberty Pump Station, includes the replacement of an existing pump with a new pump of the same size and capacity, modifications to an existing pump control valve, installation of a new stand-by, electrical generator, installation of a new automatic transfer switch, and various electrical upgrades. Area 2, Rainbow Lake Pump Station, includes the installation of a new stand-by electrical generator, automatic transfer switch, and upgrades to various electrical components.
Liberty-Chesnee-Fingerville Water District
Contract 1, (Areas 1-3): Areas 1-3 include the installation of 31,000 LF of new 3" PVC waterlines, valves, blowoff assemblies, hydrants, road bores, system connections, and related appurtenances. Contract 2 (Areas 4 & 5): Area 4, Liberty Pump Station, includes the replacement of an existing pump with a new pump of the same size and capacity, modifications to an existing pump control valve, installation of a new stand-by, electrical generator, installation of a new automatic transfer switch, and various electrical upgrades. Area 5, Rainbow Lake Pump Station, includes the installation of a new stand-by electrical generator, automatic transfer switch, and upgrades to various electrical components. Contract 3, (Areas 6 & 7): Area 6, existing Mayo Tank, includes the demolition and removal of the existing 100,000-gallon, elevated water storage tank, valve vaults, site fence, foundations, and appurtenances. Area 7, new Mayo Water Tank, includes the construction of a new 500,000-gallon, elevated water storage tank, installation of 300-LF of new 12" DIP water main, installation of a new altitude valve and vault, construction of site improvements, and installation of all related appurtenances.
Posted Date
Aug 21, 2024
Due Date
Sep 24, 2024
Release: Aug 21, 2024
Liberty-Chesnee-Fingerville Water District
Close: Sep 24, 2024
Contract 1, (Areas 1-3): Areas 1-3 include the installation of 31,000 LF of new 3" PVC waterlines, valves, blowoff assemblies, hydrants, road bores, system connections, and related appurtenances. Contract 2 (Areas 4 & 5): Area 4, Liberty Pump Station, includes the replacement of an existing pump with a new pump of the same size and capacity, modifications to an existing pump control valve, installation of a new stand-by, electrical generator, installation of a new automatic transfer switch, and various electrical upgrades. Area 5, Rainbow Lake Pump Station, includes the installation of a new stand-by electrical generator, automatic transfer switch, and upgrades to various electrical components. Contract 3, (Areas 6 & 7): Area 6, existing Mayo Tank, includes the demolition and removal of the existing 100,000-gallon, elevated water storage tank, valve vaults, site fence, foundations, and appurtenances. Area 7, new Mayo Water Tank, includes the construction of a new 500,000-gallon, elevated water storage tank, installation of 300-LF of new 12" DIP water main, installation of a new altitude valve and vault, construction of site improvements, and installation of all related appurtenances.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Liberty-Chesnee-Fingerville Water District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Liberty-Chesnee-Fingerville Water District's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database