Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Contract 1, (Areas 1-3): Areas 1-3 include the installation of 31,000 LF of new 3" PVC waterlines, valves, blowoff assemblies, hydrants, road bores, system connections, and related appurtenances. Contract 2 (Areas 4 & 5): Area 4, Liberty Pump Station, includes the replacement of an existing pump with a new pump of the same size and capacity, modifications to an existing pump control valve, installation of a new stand-by, electrical generator, installation of a new automatic transfer switch, and various electrical upgrades. Area 5, Rainbow Lake Pump Station, includes the installation of a new stand-by electrical generator, automatic transfer switch, and upgrades to various electrical components. Contract 3, (Areas 6 & 7): Area 6, existing Mayo Tank, includes the demolition and removal of the existing 100,000-gallon, elevated water storage tank, valve vaults, site fence, foundations, and appurtenances. Area 7, new Mayo Water Tank, includes the construction of a new 500,000-gallon, elevated water storage tank, installation of 300-LF of new 12" DIP water main, installation of a new altitude valve and vault, construction of site improvements, and installation of all related appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consists of water system improvements.
Posted Date
Nov 30, 2025
Due Date
Dec 19, 2025
Release: Nov 30, 2025
Close: Dec 19, 2025
Project consists of water system improvements.
AvailableWater system improvements including recoating and restoration of the interior and exterior of the existing 300,000-gallon ground storage tank and appurtenances. Replacement of two (2) existing high service pumps and all valves, piping, electrical and associated appurtenances at the pump station. Upsize of approx. 700 LF of existing 10" waterline to 12" water line and all valves and associated appurtenances.
Posted Date
Nov 17, 2025
Due Date
Dec 17, 2025
Release: Nov 17, 2025
Close: Dec 17, 2025
Water system improvements including recoating and restoration of the interior and exterior of the existing 300,000-gallon ground storage tank and appurtenances. Replacement of two (2) existing high service pumps and all valves, piping, electrical and associated appurtenances at the pump station. Upsize of approx. 700 LF of existing 10" waterline to 12" water line and all valves and associated appurtenances.
AvailableProject consists of replacing a significant portion of the water distribution system including water mains, valves, hydrants, and service meters.
Posted Date
Dec 8, 2025
Due Date
Jan 6, 2026
Release: Dec 8, 2025
Close: Jan 6, 2026
Project consists of replacing a significant portion of the water distribution system including water mains, valves, hydrants, and service meters.
AvailableProvide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
Posted Date
Dec 8, 2025
Due Date
Jan 6, 2026
Release: Dec 8, 2025
Close: Jan 6, 2026
Provide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis