Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project involves improvements to pump stations in two different areas. Area 1, Liberty Pump Station, includes the replacement of an existing pump with a new pump of the same size and capacity, modifications to an existing pump control valve, installation of a new stand-by, electrical generator, installation of a new automatic transfer switch, and various electrical upgrades. Area 2, Rainbow Lake Pump Station, includes the installation of a new stand-by electrical generator, automatic transfer switch, and upgrades to various electrical components.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Improvements to the existing Well No. 4 pump station; improvements to two existing booster pump stations; installation of a cathodic protection system at the existing Reservoir No. 2, along with miscellaneous electrical and control improvements; construction of a new treatment building, including sodium hypochlorite and polyphosphate injection systems.
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
Close: Dec 18, 2025
Improvements to the existing Well No. 4 pump station; improvements to two existing booster pump stations; installation of a cathodic protection system at the existing Reservoir No. 2, along with miscellaneous electrical and control improvements; construction of a new treatment building, including sodium hypochlorite and polyphosphate injection systems.
AvailableProject consists of water system improvements.
Posted Date
Nov 30, 2025
Due Date
Dec 19, 2025
Release: Nov 30, 2025
Close: Dec 19, 2025
Project consists of water system improvements.
AvailableWater system improvements including recoating and restoration of the interior and exterior of the existing 300,000-gallon ground storage tank and appurtenances. Replacement of two (2) existing high service pumps and all valves, piping, electrical and associated appurtenances at the pump station. Upsize of approx. 700 LF of existing 10" waterline to 12" water line and all valves and associated appurtenances.
Posted Date
Nov 17, 2025
Due Date
Dec 17, 2025
Release: Nov 17, 2025
Close: Dec 17, 2025
Water system improvements including recoating and restoration of the interior and exterior of the existing 300,000-gallon ground storage tank and appurtenances. Replacement of two (2) existing high service pumps and all valves, piping, electrical and associated appurtenances at the pump station. Upsize of approx. 700 LF of existing 10" waterline to 12" water line and all valves and associated appurtenances.
AvailableSealed proposals are requested for the Main Street Pump Station Improvements project to upgrade the City of Lewiston’s pump station systems, including demolition, a new emergency generator, electrical/HVAC/plumbing upgrades, fall protection, and site restoration. The contract requires completion by December 21, 2026 and the solicitation lists a response deadline of January 29, 2026.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Sealed proposals are requested for the Main Street Pump Station Improvements project to upgrade the City of Lewiston’s pump station systems, including demolition, a new emergency generator, electrical/HVAC/plumbing upgrades, fall protection, and site restoration. The contract requires completion by December 21, 2026 and the solicitation lists a response deadline of January 29, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis