Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Langham Creek Utility District's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
General Manager
Treasurer
President
President
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Langham Creek Utility District
The work consists of providing the necessary labor, materials, equipment, supervision, and plant for the construction of the wastewater treatment plant improvements, onsite lift station improvements, and liquid chemical conversion including but not limited to: lift station pump replacement and structural modifications; main process basins piping improvements; liquid chemical feed equipment, piping, CMU building with metal canopy chemical storage area; electrical; controls; demolition items; pavement; site grading and drainage; and site restoration as specified.
Posted Date
Nov 14, 2025
Due Date
Dec 17, 2025
Release: Nov 14, 2025
Langham Creek Utility District
Close: Dec 17, 2025
The work consists of providing the necessary labor, materials, equipment, supervision, and plant for the construction of the wastewater treatment plant improvements, onsite lift station improvements, and liquid chemical conversion including but not limited to: lift station pump replacement and structural modifications; main process basins piping improvements; liquid chemical feed equipment, piping, CMU building with metal canopy chemical storage area; electrical; controls; demolition items; pavement; site grading and drainage; and site restoration as specified.
Langham Creek Utility District
Work includes providing bonds and insurance; remove discharge head, column assembly, pump, motor, and accessories; sound lap; haul the column assembly, pump, motor and accessories to the yard and dispose of any items not specified for reuse; run water in the well overnight; provide 680-feet (680') of 1/4-inch (1/4") dekeron-coated stainless steel airline, including strapping material, airline fittings, and airline gauge; install pump, motor, column assembly, and accessories, including assembling components; disinfect the well in accordance with awwa c-654; provide performance test, including vibration analysis.
Posted Date
Sep 12, 2025
Due Date
Oct 1, 2025
Release: Sep 12, 2025
Langham Creek Utility District
Close: Oct 1, 2025
Work includes providing bonds and insurance; remove discharge head, column assembly, pump, motor, and accessories; sound lap; haul the column assembly, pump, motor and accessories to the yard and dispose of any items not specified for reuse; run water in the well overnight; provide 680-feet (680') of 1/4-inch (1/4") dekeron-coated stainless steel airline, including strapping material, airline fittings, and airline gauge; install pump, motor, column assembly, and accessories, including assembling components; disinfect the well in accordance with awwa c-654; provide performance test, including vibration analysis.
Langham Creek Utility District
The work consists of cleaning and televising approx 148,322 LF of sanitary sewer pipe including 119,894 LF of 8" pipe, 11,557 LF of 10" pipe, 4,271 LF of 12" pipe, 4,444 LF of 15" pipe, 2,540 LF of 18" pipe, 4,070 LF of 21" pipe, 1,273 LF of 24" pipe, and 273 LF of 36" pipe. The work also includes television inspection of approximately 720 sanitary sewer manholes.
Posted Date
Oct 17, 2024
Due Date
Nov 5, 2024
Release: Oct 17, 2024
Langham Creek Utility District
Close: Nov 5, 2024
The work consists of cleaning and televising approx 148,322 LF of sanitary sewer pipe including 119,894 LF of 8" pipe, 11,557 LF of 10" pipe, 4,271 LF of 12" pipe, 4,444 LF of 15" pipe, 2,540 LF of 18" pipe, 4,070 LF of 21" pipe, 1,273 LF of 24" pipe, and 273 LF of 36" pipe. The work also includes television inspection of approximately 720 sanitary sewer manholes.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.