Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes providing bonds and insurance; remove discharge head, column assembly, pump, motor, and accessories; sound lap; haul the column assembly, pump, motor and accessories to the yard and dispose of any items not specified for reuse; run water in the well overnight; provide 680-feet (680') of 1/4-inch (1/4") dekeron-coated stainless steel airline, including strapping material, airline fittings, and airline gauge; install pump, motor, column assembly, and accessories, including assembling components; disinfect the well in accordance with awwa c-654; provide performance test, including vibration analysis.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Sealed bids are solicited by Bridgeland Development, LP on behalf of Harris County Water Control & Improvement District No. 159 for construction of the Upper Langham Creek Phase 3 Channel and Detention Design, Contract 2, including extensive earthwork and reinforced concrete box/pipe installations. Bids are due 2:00 p.m. local time on February 11, 2026 and will be opened publicly in the BGE, Inc. office and via Microsoft Teams; a non-mandatory pre-bid Microsoft Teams conference is scheduled for February 4, 2026 at 2:00 p.m. Plans and bid documents are available via the civcast site (search ID 15985-00).
Posted Date
Jan 18, 2026
Due Date
Feb 11, 2026
Release: Jan 18, 2026
Close: Feb 11, 2026
Sealed bids are solicited by Bridgeland Development, LP on behalf of Harris County Water Control & Improvement District No. 159 for construction of the Upper Langham Creek Phase 3 Channel and Detention Design, Contract 2, including extensive earthwork and reinforced concrete box/pipe installations. Bids are due 2:00 p.m. local time on February 11, 2026 and will be opened publicly in the BGE, Inc. office and via Microsoft Teams; a non-mandatory pre-bid Microsoft Teams conference is scheduled for February 4, 2026 at 2:00 p.m. Plans and bid documents are available via the civcast site (search ID 15985-00).
AvailableTo perform well development with drilling rig, airlift pumping and temporary test pump and equipment, complete water and bacteriological sampling and laboratory analyses, and well disinfection.
Posted Date
Jan 27, 2026
Due Date
Feb 17, 2026
Release: Jan 27, 2026
Close: Feb 17, 2026
To perform well development with drilling rig, airlift pumping and temporary test pump and equipment, complete water and bacteriological sampling and laboratory analyses, and well disinfection.
AvailableProject will include construction of a new treatment building, a new arsenic treatment system; construction of water lines and connections to the existing well house piping; construction of concrete drying beds and an unlined infiltration basin; and installation of electrical equipment and controls upgrades.
Posted Date
Jan 18, 2026
Due Date
Feb 26, 2026
Release: Jan 18, 2026
Close: Feb 26, 2026
Project will include construction of a new treatment building, a new arsenic treatment system; construction of water lines and connections to the existing well house piping; construction of concrete drying beds and an unlined infiltration basin; and installation of electrical equipment and controls upgrades.
AvailableInstall furnishing and installing a submersible well pump, motor, column pipe, discharge head, electrical equipment, controls and associated raw water main, valves, and fittings, and buried fiber optic cable.
Posted Date
Dec 31, 2025
Due Date
Feb 4, 2026
Release: Dec 31, 2025
Close: Feb 4, 2026
Install furnishing and installing a submersible well pump, motor, column pipe, discharge head, electrical equipment, controls and associated raw water main, valves, and fittings, and buried fiber optic cable.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis