Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes providing bonds and insurance; remove discharge head, column assembly, pump, motor, and accessories; sound lap; haul the column assembly, pump, motor and accessories to the yard and dispose of any items not specified for reuse; run water in the well overnight; provide 680-feet (680') of 1/4-inch (1/4") dekeron-coated stainless steel airline, including strapping material, airline fittings, and airline gauge; install pump, motor, column assembly, and accessories, including assembling components; disinfect the well in accordance with awwa c-654; provide performance test, including vibration analysis.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construction of a culinary water production well to serve as a backup well.
Posted Date
Nov 17, 2025
Due Date
Dec 16, 2025
Release: Nov 17, 2025
Close: Dec 16, 2025
Construction of a culinary water production well to serve as a backup well.
AvailableThe Naval Research Laboratory issued a Sources Sought notice seeking potential sources capable of performing demolition and construction of a drinking water well at the POMONKEY Site in La Plata, MD. This is a market-research Sources Sought (not a solicitation or grant) to gauge industry interest and capabilities for an SBA 8(a) follow-on requirement; a draft Statement of Work is referenced. Responses (maximum 5 pages, Word or PDF) are due by Dec 25, 2025 and should be emailed to the Contract Specialist listed on the SAM.gov posting.
Posted Date
Oct 30, 2025
Due Date
Dec 25, 2025
Release: Oct 30, 2025
Close: Dec 25, 2025
The Naval Research Laboratory issued a Sources Sought notice seeking potential sources capable of performing demolition and construction of a drinking water well at the POMONKEY Site in La Plata, MD. This is a market-research Sources Sought (not a solicitation or grant) to gauge industry interest and capabilities for an SBA 8(a) follow-on requirement; a draft Statement of Work is referenced. Responses (maximum 5 pages, Word or PDF) are due by Dec 25, 2025 and should be emailed to the Contract Specialist listed on the SAM.gov posting.
Well #4 and Well #5 Electrical and Water System Improvement project includes various electrical, mechanical, HVAC, SCADA and site improvements to the existing Well #4 and Well #5 stations. Improvements include the following: selective demolition, furnish and install existing motor control centers, appropriate surge protection, step-down transformers, 120/208V panelboards, and install new 100hp variable frequency drives; replace existing interior and exterior lighting; upgrade of existing SCADA panels; furnish and install all necessary piping to connect new pump control valve, painting of all process piping; furnish and install new electrical unit heaters, exhaust fans, and louver actuators; existing driveway replacement for well #5, construction of a permanent foundation for the existing well 5 generator, well #5 generator modification and installation on permanent foundation, perimeter fencing removal and replacement, and new sliding access gates; and replacement of the existing acoustical panel ceilings. The project includes the installation of a new 300hp variable frequency drive and furnish and install motor replacement of the existing Well #2.
Posted Date
Dec 10, 2025
Due Date
Jan 30, 2026
Release: Dec 10, 2025
Provide all necessary labor, equipment, parts and supplies to: Demolition / Decommission: Decommission old well as required by Maryland state regulations, to include filling of old well with dry bentonite and properly cap or seals as per local state requirements. Prepare Water Well Abandonment-Sealing Report. Remove existing pump, pressure tanks, associated pipe connection and any device related to the existing well operation. Properly dispose any material. Remove electrical connection back to point of connection. Existing well cannot be demolish and disconnected from the water distribution system until the new well is ready to be connected to the existing water distribution. See attached file.
Posted Date
Oct 30, 2025
Due Date
Dec 25, 2025
Release: Oct 30, 2025
Close: Dec 25, 2025
Provide all necessary labor, equipment, parts and supplies to: Demolition / Decommission: Decommission old well as required by Maryland state regulations, to include filling of old well with dry bentonite and properly cap or seals as per local state requirements. Prepare Water Well Abandonment-Sealing Report. Remove existing pump, pressure tanks, associated pipe connection and any device related to the existing well operation. Properly dispose any material. Remove electrical connection back to point of connection. Existing well cannot be demolish and disconnected from the water distribution system until the new well is ready to be connected to the existing water distribution. See attached file.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 30, 2026
Well #4 and Well #5 Electrical and Water System Improvement project includes various electrical, mechanical, HVAC, SCADA and site improvements to the existing Well #4 and Well #5 stations. Improvements include the following: selective demolition, furnish and install existing motor control centers, appropriate surge protection, step-down transformers, 120/208V panelboards, and install new 100hp variable frequency drives; replace existing interior and exterior lighting; upgrade of existing SCADA panels; furnish and install all necessary piping to connect new pump control valve, painting of all process piping; furnish and install new electrical unit heaters, exhaust fans, and louver actuators; existing driveway replacement for well #5, construction of a permanent foundation for the existing well 5 generator, well #5 generator modification and installation on permanent foundation, perimeter fencing removal and replacement, and new sliding access gates; and replacement of the existing acoustical panel ceilings. The project includes the installation of a new 300hp variable frequency drive and furnish and install motor replacement of the existing Well #2.
Available