Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Langham Creek Utility District
The work consists of providing the necessary labor, materials, equipment, supervision, and plant for the construction of the wastewater treatment plant improvements, onsite lift station improvements, and liquid chemical conversion including but not limited to: lift station pump replacement and structural modifications; main process basins piping improvements; liquid chemical feed equipment, piping, CMU building with metal canopy chemical storage area; electrical; controls; demolition items; pavement; site grading and drainage; and site restoration as specified.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Town of Alma
The Project includes the following Work: Construction of a new centralized wastewater treatment plant including new headworks, grit removal, process building (pre-engineered metal building), secondary treatment process and associated concrete basins, aeration system, blowers, lift station, UV disinfection system, and all necessary ancillary piping, electrical, controls, earthwork, and biosolids removal and disposal.
Posted Date
Oct 31, 2025
Due Date
Dec 19, 2025
Release: Oct 31, 2025
Town of Alma
Close: Dec 19, 2025
The Project includes the following Work: Construction of a new centralized wastewater treatment plant including new headworks, grit removal, process building (pre-engineered metal building), secondary treatment process and associated concrete basins, aeration system, blowers, lift station, UV disinfection system, and all necessary ancillary piping, electrical, controls, earthwork, and biosolids removal and disposal.
AvailableCity of Breese
Furnishing all labor, materials, and equipment required to construct a terminal lift station and force main, mechanical fine screen, lagoon aeration improvements, moving bed biofilm reactor, tertiary filters, ultraviolet disinfection system, control/lab building and associated site piping and site improvements in accordance with the specifications and plans covering the work. Bidders must secure their information as to the condition of the site and all local conditions affecting the work prior to submitting their proposals.
Posted Date
Oct 22, 2025
Due Date
Nov 20, 2025
Release: Oct 22, 2025
City of Breese
Close: Nov 20, 2025
Furnishing all labor, materials, and equipment required to construct a terminal lift station and force main, mechanical fine screen, lagoon aeration improvements, moving bed biofilm reactor, tertiary filters, ultraviolet disinfection system, control/lab building and associated site piping and site improvements in accordance with the specifications and plans covering the work. Bidders must secure their information as to the condition of the site and all local conditions affecting the work prior to submitting their proposals.
City of Parlier
Work consist of replacement of an existing aerated lagoon wastewater treatment plant and a new extended aeration treatment facility.
Posted Date
Jan 10, 2024
Due Date
Dec 3, 2025
Release: Jan 10, 2024
City of Parlier
Close: Dec 3, 2025
Work consist of replacement of an existing aerated lagoon wastewater treatment plant and a new extended aeration treatment facility.
AvailableCity of Lake Charles
Work includes wastewater treatment plant b/c sludge processing improvements.
Posted Date
Nov 7, 2025
Due Date
Dec 2, 2025
Release: Nov 7, 2025
City of Lake Charles
Close: Dec 2, 2025
Work includes wastewater treatment plant b/c sludge processing improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis