Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Chanute
Mill/overlay rehabilitation, and the other will be a full depth reclamation .The mill/overlay option will include milling, crack repairs, and full depth patching for failed pavement areas. The full depth reclamation will not require crack sealing or patching but will instead require pulverization and compaction of reclaimed base. Both schedules will include pavement markings and electrical changes.
Posted Date
Apr 29, 2026
Due Date
May 22, 2026
Release: Apr 29, 2026
City of Chanute
Close: May 22, 2026
Mill/overlay rehabilitation, and the other will be a full depth reclamation .The mill/overlay option will include milling, crack repairs, and full depth patching for failed pavement areas. The full depth reclamation will not require crack sealing or patching but will instead require pulverization and compaction of reclaimed base. Both schedules will include pavement markings and electrical changes.
City of Chanute
Project consists of construction of temporary construction entrances, parking, job trailers, laydown, and staging areas; Stripping and stockpiling of topsoil and excavation of wastewater treatment plant site; Installation and maintenance of erosion control; Construction of new lift station, which includes the building, wetwell, primary and secondary pump systems, bar screen with compactor, screen, piping, flanges, fittings, valves, guardrails, MOVs, gates, meters, and electrical to make a working system; Construction of the new headworks station, which includes the structure, canopy, rotating drum fine screen with compactor, gates, coarse screen, heat trace and blankets, piping, flanges, fittings, valves, guardrails, MOV, meter, and electrical to make a working system; Construction of the Aeromod system, which includes the structure, air lines, piping, valves, guardrails, fittings, flanges, meter, and electrical (according to manufacturer's plans), and sludge lift station to make a working system; Construction of the motor control center, which includes the building, blowers, and rotary drum thickener, pumps, fittings, compressors, air lines, piping, valves, fittings, and electrical to make a working system; Construction of the tailworks station, which includes the building, cloth media filter systems (according to manufacturer’s plans), UV disinfection systems, piping, flanges, MOVs, valves, guardrails, composite sampling station, meters, and electrical to make a working system; Construction of new emergency spill way for the Extraneous Flow Basin; Installation of new fiberglass shelters; Installation of new electrical equipment; Installation of control system hardware; Owner’s integrator shall provide PLCs, PCs, software, monitors, miscellaneous items to provide backbone of the control/SCADA system; Programming of SCADA system software and hardware will be provided by owner’s integrator; Contractor to provide and install conduits and conductors for electrical and controls between all equipment, controls, PLCs, instruments, and fiber systems; Installation of process piping systems; Installation of French drain and storm water systems; Installation of gravity sanitary sewer system; Installation of potable and non-potable water piping; Installation of gas lines; Remodel of current laboratory; Completion of general site work including finish grading, topsoil, seeding, and mulching over grading limits; Coordination with city to switch wastewater treatment operation from existing plant to new treatment plant; Demolition of old lift station, headworks, clarifiers, trickling filters, digesters, and tailworks; Completion of general roads, entrances, sidewalks, and concrete approach pads.
Posted Date
Mar 23, 2026
Due Date
May 20, 2026
Release: Mar 23, 2026
City of Chanute
Close: May 20, 2026
Project consists of construction of temporary construction entrances, parking, job trailers, laydown, and staging areas; Stripping and stockpiling of topsoil and excavation of wastewater treatment plant site; Installation and maintenance of erosion control; Construction of new lift station, which includes the building, wetwell, primary and secondary pump systems, bar screen with compactor, screen, piping, flanges, fittings, valves, guardrails, MOVs, gates, meters, and electrical to make a working system; Construction of the new headworks station, which includes the structure, canopy, rotating drum fine screen with compactor, gates, coarse screen, heat trace and blankets, piping, flanges, fittings, valves, guardrails, MOV, meter, and electrical to make a working system; Construction of the Aeromod system, which includes the structure, air lines, piping, valves, guardrails, fittings, flanges, meter, and electrical (according to manufacturer's plans), and sludge lift station to make a working system; Construction of the motor control center, which includes the building, blowers, and rotary drum thickener, pumps, fittings, compressors, air lines, piping, valves, fittings, and electrical to make a working system; Construction of the tailworks station, which includes the building, cloth media filter systems (according to manufacturer’s plans), UV disinfection systems, piping, flanges, MOVs, valves, guardrails, composite sampling station, meters, and electrical to make a working system; Construction of new emergency spill way for the Extraneous Flow Basin; Installation of new fiberglass shelters; Installation of new electrical equipment; Installation of control system hardware; Owner’s integrator shall provide PLCs, PCs, software, monitors, miscellaneous items to provide backbone of the control/SCADA system; Programming of SCADA system software and hardware will be provided by owner’s integrator; Contractor to provide and install conduits and conductors for electrical and controls between all equipment, controls, PLCs, instruments, and fiber systems; Installation of process piping systems; Installation of French drain and storm water systems; Installation of gravity sanitary sewer system; Installation of potable and non-potable water piping; Installation of gas lines; Remodel of current laboratory; Completion of general site work including finish grading, topsoil, seeding, and mulching over grading limits; Coordination with city to switch wastewater treatment operation from existing plant to new treatment plant; Demolition of old lift station, headworks, clarifiers, trickling filters, digesters, and tailworks; Completion of general roads, entrances, sidewalks, and concrete approach pads.
City of Chanute
Rehabilitate the taxiway concrete pavements. Work includes concrete panel replacements, joint sealing, and pavement markings.
Posted Date
Mar 24, 2025
Due Date
Apr 18, 2025
Release: Mar 24, 2025
City of Chanute
Close: Apr 18, 2025
Rehabilitate the taxiway concrete pavements. Work includes concrete panel replacements, joint sealing, and pavement markings.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Not viable here—skip and pivot directly to coops.
Coops: Lead with cooperative purchasing. Confirm your offering is on Sourcewell or DIR, ask procurement to validate, and position as a fast-track, compliant buy.
City of Chanute, KS: No viable sole source path identified. Records show no sole source use; the city defaults to formal competitive bidding (K.S.A.
Board meetings and strategic plans from City of Chanute
The Commission addressed various municipal business items, including the approval of wastewater plant bonds and the review of bids for the new wastewater plant project. Significant focus was placed on property maintenance and code enforcement, specifically addressing violations related to the accumulation of nuisance materials such as tires, dilapidated campers, and inoperable vehicles at multiple residential locations. Additionally, the meeting included the review of administrative items such as board and committee reports, road closure requests for the 4th of July celebration, and the processing of warrant registers.
The City Commission meeting included a report from the City Manager regarding the proposed 2027 budget and updates on airport and communication system projects. The commission approved increases to golf course fees, rescheduled a upcoming regular meeting to accommodate municipal bond activity, and appointed a new member to the Public Library Board of Trustees. Additionally, the commission authorized the abatement of various properties identified as being in violation of municipal codes.
The meeting included several key topics such as requests for temporary street and alley closures, the use of Santa Fe Park for community events like the Chanute Mexican Fiesta and a class reunion, and the approval of alcohol consumption on city property. The Commission reviewed Reinvestment Housing Incentive District matters, land acquisition in Osa Martin, and adopted several resolutions declaring various properties in violation of the municipal code. Additionally, the commission addressed uncollectible accounts and reviewed financial warrant registers.
The meeting included the proclamation of National Library Week and the approval of the Consent Agenda. Discussions were held regarding the 2027 budget calendar, updates on the diesel generation units, and the authorization for staff to proceed with additional applications for the Voluntary Demolition Program. The commission approved requests to block streets for a community event and to permit fireworks for a hospital gala. Key financial actions included the adoption of resolutions to authorize wastewater treatment project costs and the sale of bonds. Additionally, the commission approved the demolition of the Katy Ballfield and Stadium and passed resolutions addressing various property code violations. An executive session was held to discuss non-elected personnel with no further action taken.
The meeting included a proclamation designating April as Child Abuse Awareness and Prevention Month. Key agenda items involved the approval of an amended agenda and the consent agenda, which included event-related street closures. The City Manager provided an operations update and announced an upcoming joint work session. The Commission approved ordinances to update water and sewer connection fees, reflecting current material costs, and adopted multiple resolutions authorizing the abatement of property nuisances. The session concluded with acknowledgments of local achievements by the high school chess team and a local organization.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Chanute's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge