Old Mine Road and Utility Improvements
Posted
Sep 2, 2026
Sep 23, 2026
Work includes installation of drainage infrastructure; installation of water & sewer infrastructure and paving construction. Also includes 2,400 LF of silt fence (wire-backed); 3.756 CY of mass grading: localized earthwork to create new road alignments and profiles; 7,175 SY of 12" flexible base: provide and install TXDOT item #247, type A, grade 1. 27' width of flexbase; min.; 107 LF of 4" water main: provide and install 4" water main, (type C900, DR18). Including fittings; 2 EA of 4" bore: install 30 LF bore, 8" schedule 40 PVC sleeve for 6" water main crossing.