Lake View Camp & Conf. Center - 2025 Wastewater System Improvements
Posted
Mar 17, 2026
Dec 31, 2026
Project includes construction of a new wastewater treatment facility to effectively treat new wastewater loads generated by the facilities at Lake View Camp and Conference Center. The improvements consist of a septic tank based moving bed biofilm reactor system, UV disinfection, blower and control building, and a standby electrical generator for back-up power. The project also includes the construction of approx. 1800 LF of 6-inch and 8-inch sanitary sewer main.
