Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Lake Egypt Fire Protection District's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Lake Egypt Fire Protection District
Construction services are sought for a new storage building.
Posted Date
-
Due Date
Jan 28, 2026
Release: -
Lake Egypt Fire Protection District
Close: Jan 28, 2026
Construction services are sought for a new storage building.
AvailableLake Egypt Fire Protection District
Construct a 3-bay 50' x 60' Pre-Engineered Metal Building (PEMB), with slab-on-grade floor, powered overhead doors, interior and exterior lighting, electrical service, man-doors, concrete apron, and propane gas heat. Interior finish shall be metal liner panel on walls, exposed scrim-faced insulation on underside of roof.
Posted Date
Jan 6, 2026
Due Date
Jan 28, 2026
Release: Jan 6, 2026
Lake Egypt Fire Protection District
Close: Jan 28, 2026
Construct a 3-bay 50' x 60' Pre-Engineered Metal Building (PEMB), with slab-on-grade floor, powered overhead doors, interior and exterior lighting, electrical service, man-doors, concrete apron, and propane gas heat. Interior finish shall be metal liner panel on walls, exposed scrim-faced insulation on underside of roof.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.