Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction services are sought for a new storage building.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construct a 3-bay 50' x 60' Pre-Engineered Metal Building (PEMB), with slab-on-grade floor, powered overhead doors, interior and exterior lighting, electrical service, man-doors, concrete apron, and propane gas heat. Interior finish shall be metal liner panel on walls, exposed scrim-faced insulation on underside of roof.
Posted Date
Jan 6, 2026
Due Date
Jan 28, 2026
Release: Jan 6, 2026
Close: Jan 28, 2026
Construct a 3-bay 50' x 60' Pre-Engineered Metal Building (PEMB), with slab-on-grade floor, powered overhead doors, interior and exterior lighting, electrical service, man-doors, concrete apron, and propane gas heat. Interior finish shall be metal liner panel on walls, exposed scrim-faced insulation on underside of roof.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
New construction of dry storage building.
Posted Date
Dec 18, 2025
Due Date
Jan 22, 2026
Release: Dec 18, 2025
Close: Jan 22, 2026
New construction of dry storage building.
AvailableWork include construct a sand and salt storage building approximately 20'x40' 2-sand and salt storage area 14'x20' with 8' concrete walls and sliding access door 3-center open storage area 14'x20 with 8' chain link lockable gates 4-closed storage area 12'x20' w/ 8'x10' garage door and 36" side entry door, heavy duty shelves.
Posted Date
Jan 8, 2026
Due Date
Feb 4, 2026
Release: Jan 8, 2026
Close: Feb 4, 2026
Work include construct a sand and salt storage building approximately 20'x40' 2-sand and salt storage area 14'x20' with 8' concrete walls and sliding access door 3-center open storage area 14'x20 with 8' chain link lockable gates 4-closed storage area 12'x20' w/ 8'x10' garage door and 36" side entry door, heavy duty shelves.
AvailableWork consist of installing a new concrete foundation and slab for a new 52' x 30 2" x 11' storage building with a 10 lean-to.
Posted Date
-
Due Date
Feb 18, 2026
Close: Feb 18, 2026
Work consist of installing a new concrete foundation and slab for a new 52' x 30 2" x 11' storage building with a 10 lean-to.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →