Winston Park Storm Sewer Improvements
Posted
Sep 1, 2026
Oct 2, 2026
Work includes 1 LS topsoil excavation and placement; 352 LF perimeter erosion barrier; 1 LS seeding (complete); 1 EA pipe end section removal; 50 cy removal and disposal of unsuitable material; 1 EA precast reinforced concrete flared end sections 48"; 31 LF storm sewers, class a, type 2 48"; 37 LF storm sewer removal 48"; 1 EA manholes, type a, 6'-dia, type 1 frame, closed lid; 1 EA removing manholes; 969 LF television inspection of sewer; 1 EA cofferdam (type 2) (in- stream/wetland work); 1 EA proposed manhole/catch basin connection over existing storm sewer; 969 LF storm sewers to be cleaned 48"