Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Jeffersonville Sewer Board's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Jeffersonville Sewer Board
The construction of approx. 850 LF of 8" PVC gravity sewer, 5 new sanitary sewer manhole structures, extension and connection of approx. 1,500 LF of 6" PVC sanitary sewer property service connections, lining of approx. 136 LF of existing 8" VCP sanitary sewer with reinstatement of 4 property service connections, safeloading and abandonment of approx. 800 LF of existing 8" VCP sanitary sewer and manholes, in addition to all equipment and services required to complete this work, and all other items.
Posted Date
Jan 2, 2026
Due Date
Jan 28, 2026
Release: Jan 2, 2026
Jeffersonville Sewer Board
Close: Jan 28, 2026
The construction of approx. 850 LF of 8" PVC gravity sewer, 5 new sanitary sewer manhole structures, extension and connection of approx. 1,500 LF of 6" PVC sanitary sewer property service connections, lining of approx. 136 LF of existing 8" VCP sanitary sewer with reinstatement of 4 property service connections, safeloading and abandonment of approx. 800 LF of existing 8" VCP sanitary sewer and manholes, in addition to all equipment and services required to complete this work, and all other items.
AvailableJeffersonville Sewer Board
Provide screening and flow measurement equipment for wet-weather flows between the existing headworks and high-rate clarification (Actiflo) system, includes concrete channel structure with railings, cantilevered platform, and removable grating; one (1) mechanically cleaned screen rated for a peak 25 million GAL per day (MGD); one (1) 24" flume and level sensor for flow measurement; one (1) 36" plug valve housed in a valve vault; yard piping; and all associated electrical and controls for each. See attached file.
Posted Date
Oct 21, 2025
Due Date
Nov 20, 2025
Release: Oct 21, 2025
Jeffersonville Sewer Board
Close: Nov 20, 2025
Provide screening and flow measurement equipment for wet-weather flows between the existing headworks and high-rate clarification (Actiflo) system, includes concrete channel structure with railings, cantilevered platform, and removable grating; one (1) mechanically cleaned screen rated for a peak 25 million GAL per day (MGD); one (1) 24" flume and level sensor for flow measurement; one (1) 36" plug valve housed in a valve vault; yard piping; and all associated electrical and controls for each. See attached file.
Jeffersonville Sewer Board
Removal and replacement of approx. 500 LF of 36" rcp gravity sewer with pvc, removal and replacement of three (3) sanitary manholes, installation of approximately 150 LF of 12" rcp storm sewer, installation of three (3) storm manholes, and maintenance of flow, in addition to all equipment and services required to complete this work.
Posted Date
Aug 29, 2025
Due Date
Sep 24, 2025
Release: Aug 29, 2025
Jeffersonville Sewer Board
Close: Sep 24, 2025
Removal and replacement of approx. 500 LF of 36" rcp gravity sewer with pvc, removal and replacement of three (3) sanitary manholes, installation of approximately 150 LF of 12" rcp storm sewer, installation of three (3) storm manholes, and maintenance of flow, in addition to all equipment and services required to complete this work.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.