Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Jasper County
Removal and replacement of an existing 25'-long multi-span steel girder bridge with a new double cell 10' span x 5' tall reinforced concrete box culvert including embankment, riprap, excavation, roadway improvements, and asphalt paving.
Posted Date
Jun 25, 2026
Due Date
Aug 13, 2026
Release: Jun 25, 2026
Jasper County
Close: Aug 13, 2026
Removal and replacement of an existing 25'-long multi-span steel girder bridge with a new double cell 10' span x 5' tall reinforced concrete box culvert including embankment, riprap, excavation, roadway improvements, and asphalt paving.
AvailableJasper County
Provide county circuit clerk's office records preservation project to digitize approx. 2,056,00 historical record volumes.
Posted Date
May 19, 2026
Due Date
Jun 16, 2026
Release: May 19, 2026
Jasper County
Close: Jun 16, 2026
Provide county circuit clerk's office records preservation project to digitize approx. 2,056,00 historical record volumes.
Jasper County
Elevator Repair, Design and Installment.
Posted Date
Feb 16, 2026
Due Date
Mar 10, 2026
Release: Feb 16, 2026
Jasper County
Close: Mar 10, 2026
Elevator Repair, Design and Installment.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $12,000, use sole source.
Coops: Use an existing cooperative contract; confirm process with the County Clerk.
Jasper County, MO shows no meaningful sole source flexibility. With a low $12,000 competitive bid ceiling, sole source attempts are impractical.
Board meetings and strategic plans from Jasper County
The Stormwater Management Plan for Jasper County, Missouri, outlines the county's strategy for the 2026-2031 permitting period to manage stormwater runoff and reduce pollutants. It details a comprehensive Stormwater Management Program built around six Minimum Control Measures (MCMs): Public Education and Outreach, Public Participation, Illicit Discharge Detection and Elimination, Construction Site Stormwater Runoff Control, Post-Construction Stormwater Management in New Development & Redevelopment, and Pollution Prevention/Good Housekeeping for Municipal Operations. The plan aims to achieve compliance with NPDES permit requirements and address Total Maximum Daily Loads (TMDLs) through these measures.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Jasper County's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge