MSPB-HVAC-Refresh-for-Computer-Server- Room RFP
Aug 25, 2026
Closes
Sep 11, 2026
The Contractor shall provide all labor, supervision, materials, equipment, tools, transportation, permits, testing, commissioning, and documentation necessary to complete the project. The work shall include, but is not limited to: Equipment Procurement. Furnish and install: Three (3) Computer Room Air Conditioning (CRAC) Units; Two (2) roof-mounted dry coolers; Two (2) associated pump packages (pump paks); Glycol piping system; Refrigerant piping, if required by the selected equipment; Isolation valves, balancing valves, strainers, and accessories; Structural roof supports as required; Electrical disconnects; Power wiring; Control wiring; Condensate drain piping; Expansion tanks; Air separators; Chemical treatment and glycol solution; Monitoring and alarm interfaces. See attached file.