Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
National Center for Education Statistics identifier.
Total number of schools in the district.
School mascot.
Total number of staff members.
Highest grade level offered.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Hillsboro Community Unit School District 3
Project includes removal and replacement of existing asphalt shingle of mansard roof around the cafeteria and gym with thru-fastened metal roof panels and complete removal and replacement of existing membrane roofing system with new rigid insulation and KEE PVC membrane.
Posted Date
Mar 16, 2026
Due Date
Apr 9, 2026
Release: Mar 16, 2026
Hillsboro Community Unit School District 3
Close: Apr 9, 2026
Project includes removal and replacement of existing asphalt shingle of mansard roof around the cafeteria and gym with thru-fastened metal roof panels and complete removal and replacement of existing membrane roofing system with new rigid insulation and KEE PVC membrane.
AvailableHillsboro Community Unit School District 3
Base bid: Project consists of the construction of 6 tennis courts with reinforced cast-in-place concrete pavement, and related grading, drainage, fencing, tennis equipment, and tennis surfacing. Electrical work consists of convenience outlet and sports lighting of 3 of the tennis courts as well as additional parking lot poles and fixtures. Alt. bid #1: Project consists of reinforced concrete frost wall around the west and portions of the north and south edges of the tennis court pavement. Alt. bid #2: Project consists of additional parking lot poles.
Posted Date
Apr 3, 2025
Due Date
Apr 25, 2025
Release: Apr 3, 2025
Hillsboro Community Unit School District 3
Close: Apr 25, 2025
Base bid: Project consists of the construction of 6 tennis courts with reinforced cast-in-place concrete pavement, and related grading, drainage, fencing, tennis equipment, and tennis surfacing. Electrical work consists of convenience outlet and sports lighting of 3 of the tennis courts as well as additional parking lot poles and fixtures. Alt. bid #1: Project consists of reinforced concrete frost wall around the west and portions of the north and south edges of the tennis court pavement. Alt. bid #2: Project consists of additional parking lot poles.
Hillsboro Community Unit School District 3
Base bid: Work includes abandoning of existing boilers, demolition of existing exterior boiler stack and removal of existing hydronic piping at existing boilers, as well as hydronic piping to reconnect existing loop to piping roughed-in as part of a separate new construction project. Work also includes split system equipment to provide cooling in the kitchen and roof top units to provide cooling in classrooms and library. Architectural, roofing and electrical work are commensurate with the HVAC scope of work. Alt bid #1: Work includes the demolition and removal of existing boilers.
Posted Date
Feb 10, 2025
Due Date
Mar 6, 2025
Release: Feb 10, 2025
Hillsboro Community Unit School District 3
Close: Mar 6, 2025
Base bid: Work includes abandoning of existing boilers, demolition of existing exterior boiler stack and removal of existing hydronic piping at existing boilers, as well as hydronic piping to reconnect existing loop to piping roughed-in as part of a separate new construction project. Work also includes split system equipment to provide cooling in the kitchen and roof top units to provide cooling in classrooms and library. Architectural, roofing and electrical work are commensurate with the HVAC scope of work. Alt bid #1: Work includes the demolition and removal of existing boilers.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Hillsboro Community Unit School District 3
The committee meeting involved multiple site visits to review facility needs and ongoing projects. Discussions included reviewing options for concrete stairs at HHS, where a fourth pricing option is to be developed. Upgrades for the old gym at HJHS, including paint, ceiling treatment, and flooring, were discussed, alongside receiving quotes for new bleachers in the new gym and assessing facility needs for elective options. At Beckemeyer, the committee toured the building to consider classroom division or space reassignment to improve educational opportunities. Furthermore, the committee toured the future Home of HCCDC to review the floor plan and discuss safety precautions like sprinkling and guardrails. Finally, the building trades house project, which is nearing completion, was toured to observe painting and exterior finishing touches.
The Personnel and Policy Committee meeting included a review and discussion regarding proposed language for the coaching handbook concerning parents serving as volunteer coaches while their children participate in the program, focusing on conflicts of interest and competitive fairness. The committee requested administration to draft revised language incorporating a grandfather clause and provisions for parents who volunteered three years prior to their child's participation. Additionally, the committee discussed concerns about vaping on campus, reviewing potential solutions such as vape detection devices, enhanced supervision, educational strategies, disciplinary consequences, and random student testing. Administration was tasked with contacting local law enforcement and health agencies for cooperation on combating vaping issues.
The committee received updates on the Hillsboro High School project, including roadway delays and remaining tasks. They discussed potential locations for future home-building projects by the Building Trades program and reviewed upcoming projects across the district, such as the roof replacement at Beckemeyer Elementary and future construction at Hillsboro Community Child Development Center (HCCDC). The committee also discussed planned upgrades to stage lighting at Hillsboro High School gymnasium and potential uses for the Energy Transition Community Grant funds, including facility upgrades and parking improvements. Administration will develop a prioritized list of qualifying projects for the next board meeting.
The committee discussed the condition of curbing and gutters along the west side of the new high school entrance and directed administration to receive pricing on repairs. Areas of asphalt requiring patching due to construction-related damage were reviewed, and O'Shea Builders were requested to address the issues. The need for new asphalt at the intersection near the Topper Tunnel entrance was discussed, and the committee supports obtaining quotes for the work.
The committee discussed student participation in dual sports, including potential injury risks and schedule conflicts. They reviewed residency policies and procedures, emphasizing consistent enforcement and early communication with families. The role of parents as volunteer coaches was also discussed, with concerns raised about potential conflicts of interest and program turnover. The committee agreed to bring the topics of dual sports participation and parents as volunteer coaches to the full Board for further discussion.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Hillsboro Community Unit School District 3's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database