Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Harris County Mud 421
Harris County Municipal Utility District No. 421 is soliciting bids to expand its surface water re‑pump facility in Harris County, Texas. The work includes constructing a 428,000‑gallon bolted galvanized ground storage tank, installing two 2,579 GPM booster pumps, removing one 715 GPM pump, and associated electrical and ancillary improvements. Bids are due March 26, 2026 at 10:00 AM Central via CivCast or at EHRA Engineering, with a non‑mandatory pre‑bid onsite on March 12, 2026.
Posted Date
-
Due Date
Mar 26, 2026
Harris County Mud 421
Close: Mar 26, 2026
Harris County Municipal Utility District No. 421 is soliciting bids to expand its surface water re‑pump facility in Harris County, Texas. The work includes constructing a 428,000‑gallon bolted galvanized ground storage tank, installing two 2,579 GPM booster pumps, removing one 715 GPM pump, and associated electrical and ancillary improvements. Bids are due March 26, 2026 at 10:00 AM Central via CivCast or at EHRA Engineering, with a non‑mandatory pre‑bid onsite on March 12, 2026.
AvailableHarris County Mud 421
Work consist of stormwater pump station including construction of a ten-foot (10') DIA precast concrete wet well and a 5'x20' cast-in-place concrete discharge trough, two (2) submersible pumps with accessories, piping, valves, fittings, and supports; protective coatings; site work; concrete pavement; on-site storm sewer piping; well point system and dewatering as necessary; pump station control panel, automatic transfer switch, diesel generator and subbase fuel tank, conduit, wires; trench safety system; see attached file.
Posted Date
Sep 18, 2024
Due Date
Sep 27, 2024
Release: Sep 18, 2024
Harris County Mud 421
Close: Sep 27, 2024
Work consist of stormwater pump station including construction of a ten-foot (10') DIA precast concrete wet well and a 5'x20' cast-in-place concrete discharge trough, two (2) submersible pumps with accessories, piping, valves, fittings, and supports; protective coatings; site work; concrete pavement; on-site storm sewer piping; well point system and dewatering as necessary; pump station control panel, automatic transfer switch, diesel generator and subbase fuel tank, conduit, wires; trench safety system; see attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Harris County Mud 421's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database