Guardrail Repairs, Various Locations (BR179, 257, 611)
Aug 12, 2026
Closes
Aug 28, 2026
Work incldues 1 EA guardrail end treatment, type os (bridge 179 ne quadrant); 1 EA pedestrian handrail repairs (bridge 257 sw quadrant); 100 LF guardrail, w-beam, 6'-3" spacing (bridge 611 nw quadrant); 150 LF guardrail, w-beam, 6'-3" spacing (bridge 611 ne quadrant).
