Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Gulf Coast Electric Cooperative
Proposals from qualified respondents capable of providing services to: (a) install one (1), new power switchyard control house building for the gcec zone 4. 1 electric utility system that is currently being constructed at tyndall afb. 1 the ~761 gross square foot power switchyard control house will provide an environmentally controlled enclosure to house equipment such as relay and control panels, an automatic transfer switch (“ats”), ac and dc service panelboards, batteries and battery chargers, and other components necessary for operating and monitoring the switching station’s electrical equipment, as well as the electrical power distribution smart vista sd switchgear along the new zone 4. 1 installed main loop feeders at tyndall afb. Services include site development and construction of the building’s foundation. (b) verify that the power switchyard control house building and foundation meet design specifications through structural, site, and factory testing (if applicable). Services include confirmation of proper installation, structural integrity, alignment, weatherproofing, fire resistance, and load capacity to ensure the building is stable, sealed, and suitable for future equipment. Foundation validation shall include strength testing, soil compaction, reinforcement inspection, anchor bolt verification, and levelness surveying to confirm compliance with code and design requirements. Structural commissioning shall document that all tolerances are met and that the building is safe, stable, and ready to receive interior systems and equipment.
Posted Date
Jun 22, 2026
Due Date
Jul 13, 2026
Release: Jun 22, 2026
Gulf Coast Electric Cooperative
Close: Jul 13, 2026
Proposals from qualified respondents capable of providing services to: (a) install one (1), new power switchyard control house building for the gcec zone 4. 1 electric utility system that is currently being constructed at tyndall afb. 1 the ~761 gross square foot power switchyard control house will provide an environmentally controlled enclosure to house equipment such as relay and control panels, an automatic transfer switch (“ats”), ac and dc service panelboards, batteries and battery chargers, and other components necessary for operating and monitoring the switching station’s electrical equipment, as well as the electrical power distribution smart vista sd switchgear along the new zone 4. 1 installed main loop feeders at tyndall afb. Services include site development and construction of the building’s foundation. (b) verify that the power switchyard control house building and foundation meet design specifications through structural, site, and factory testing (if applicable). Services include confirmation of proper installation, structural integrity, alignment, weatherproofing, fire resistance, and load capacity to ensure the building is stable, sealed, and suitable for future equipment. Foundation validation shall include strength testing, soil compaction, reinforcement inspection, anchor bolt verification, and levelness surveying to confirm compliance with code and design requirements. Structural commissioning shall document that all tolerances are met and that the building is safe, stable, and ready to receive interior systems and equipment.
AvailableGulf Coast Electric Cooperative
Large Scale Base Camp Logistics Services including but not limited to Sleep Units, Catering Units, Showering Units and Laundry Units in the event of a federal, state, or electric power distribution system declared disaster.
Posted Date
Apr 17, 2026
Due Date
May 8, 2026
Release: Apr 17, 2026
Gulf Coast Electric Cooperative
Close: May 8, 2026
Large Scale Base Camp Logistics Services including but not limited to Sleep Units, Catering Units, Showering Units and Laundry Units in the event of a federal, state, or electric power distribution system declared disaster.
Gulf Coast Electric Cooperative
This project consists of resurfacing and/or reconstructing in portion or whole of various roadways within County. The project will include work associated with the reconstruction of roadways such as maintenance of traffic, stormwater pollution prevention, sod stabilization shoulder work, pavement striping including reflective pavement markers (RPM). The contractor is to maintain traffic flow at all times with minimal delays. Roadways are to have two-way traffic opened during all non-working hours. Lane closures will be granted by County staff during working hours. The County Road Department will retain Thirty (30) loads of millings from this project. County will provide trucks to haul the Thirty (30) loads of millings from the jobsite.
Posted Date
Nov 20, 2025
Due Date
Jan 7, 2026
Release: Nov 20, 2025
Gulf Coast Electric Cooperative
Close: Jan 7, 2026
This project consists of resurfacing and/or reconstructing in portion or whole of various roadways within County. The project will include work associated with the reconstruction of roadways such as maintenance of traffic, stormwater pollution prevention, sod stabilization shoulder work, pavement striping including reflective pavement markers (RPM). The contractor is to maintain traffic flow at all times with minimal delays. Roadways are to have two-way traffic opened during all non-working hours. Lane closures will be granted by County staff during working hours. The County Road Department will retain Thirty (30) loads of millings from this project. County will provide trucks to haul the Thirty (30) loads of millings from the jobsite.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge