Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Greater Augusta Utility District
Clean and inspect drinking water storage tanks.
Posted Date
-
Due Date
Jan 7, 2026
Greater Augusta Utility District
Close: Jan 7, 2026
Clean and inspect drinking water storage tanks.
Greater Augusta Utility District
Fiber Optic Switch / Cable Installation and Cable Repair. 1. Install a new 24 strand fiber optic cable through an existing empty 4” diameter, 4,000’ long PVC conduit between the wastewater treatment plant and a structure located near Bridge on the rail trail. 2. Troubleshoot and repair an existing daisy chained fiber optic network located on the Rail Trail between the wastewater treatment plant and Memorial Bridge in Augusta, Maine. The network has failed and needs to be spliced to be repaired.
Posted Date
-
Due Date
Nov 26, 2025
Greater Augusta Utility District
Close: Nov 26, 2025
Fiber Optic Switch / Cable Installation and Cable Repair. 1. Install a new 24 strand fiber optic cable through an existing empty 4” diameter, 4,000’ long PVC conduit between the wastewater treatment plant and a structure located near Bridge on the rail trail. 2. Troubleshoot and repair an existing daisy chained fiber optic network located on the Rail Trail between the wastewater treatment plant and Memorial Bridge in Augusta, Maine. The network has failed and needs to be spliced to be repaired.
Greater Augusta Utility District
Work includes small building addition, minor electrical relocation, minor demolition and exterior water main and drain line piping.
Posted Date
Sep 14, 2025
Due Date
Oct 8, 2025
Release: Sep 14, 2025
Greater Augusta Utility District
Close: Oct 8, 2025
Work includes small building addition, minor electrical relocation, minor demolition and exterior water main and drain line piping.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Greater Augusta Utility District
The meeting included discussions on project updates, such as the Kbec River Crossing and Front Street projects. There was also a presentation on grease interceptor standards, including visits to restaurants and food establishments to ensure compliance. The board discussed the importance of maintaining records and the costs associated with pumping traps. Additionally, there was a focus on innovative practices like epoxy coating for manholes, highlighting cost savings and long-term benefits.
The meeting covered discussions on R Ellis's rate study, focusing on drinking water, sewer, and storm water rates. There were concerns about material availability and pricing, particularly for pipe deliveries, generators, and switch gear. The board also discussed a Front Street sewer station project, which was awarded to Jender, and a Highland Avenue project, where concrete curbing replaced binous curving. Additionally, there were conversations around a trunk line project and high-pressure sewer near Lakes.
The board meeting included discussions regarding potential litigation related to feed contamination in the river affecting wells. The discussion involved Napoli Skolnick firm and focused on pursuing claims under the federal super fund law (CIRLA) against entities, primarily paper mills, for PAS contamination. The aim is to recover costs for water utility districts, like Augusta, due to operational expenses. The board also addressed questions about the legality of past contamination practices and the statute of limitations for filing claims.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Greater Augusta Utility District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge